"Budget left to be allocated" corresponds to "Available" - "Budgeted posted":
- Level 1: if the envelopes are attached to a project (Project code entered in column "Reference"), the "Left to Distribute" corresponds to the total of the "Left to Distribute" of envelopes attached to this project. If the envelopes are not attached to a project (Project code not entered in column "Reference"), the "Left to Distribute" corresponds to the total of the "Left to Distribute" of all envelopes of the selection.
- Level 2: Left to Distribute of each envelope.
- Level 3: Left to Distribute of each budget.
- Level 4: the left-to-distribute amount is the same as the available amount, as the budget lines which correspond to the finest budget level are not divided.