The operation time is the time necessary to manufacture the product described in the routing.
The operating time:
- in hours or minutes (see the time unit),
- is expressed for 1, 100, 1,000 or a lot of units of the operation based on the management unit,
- can be proportional or fixed, based on the type of operation times.
Example :
Time unit = Hours
Time type = Proportional
Management unit = Time for 100
Operating time = 2
Operation unit = Kg
Finished product unit = One
Conversion coefficient DU-OU = 0.5
The operating time equals 2 hours for 100 Kg. If the Work Order is launched for 1,000 units of finished product, the time necessary to produce this operation is 10 hours to obtain 500 Kg.