Local menu | Title | Length | Mini | Maxi | Activity code |
---|---|---|---|---|---|
2324 | Weighing station messages | 0 | 0 | 0 |
Number | Text |
---|---|
1 | Valve already processed |
2 | Minimum range > or = maximum range |
3 | Maximum tare > Maximum range |
4 | Element already present |
5 | Container type <> SHI file packaging |
6 | Sentence does not exist or is incorrect! |
7 | Optional |
8 | Mandatory |
9 | Box Procedure |
10 | Phases |
11 | Components |
12 | Weighing history |
13 | Reconciliation not allowed ! |
14 | Being reconciled ! |
15 | Being weighed |
16 | Element does not exist ! |
17 | Some materials are not weighed ! |
18 | Reconciliation stopped for the phase ! Yes=Validate No = Delete? |
19 | Several entries with the same lot = weight mandatory |
20 | Deletion of all the reconciliations of the phase? |
21 | Reconciliation of the phase not completed ... deleting the reconciliations of the phase |
22 | Reconciliation completed for the phase ! |
23 | Nonexistent tracking transaction (parameter WEITRSNUM) |
24 | Nonexistent tracking counter |
25 | in weighing process message |
26 | Order number already reconciled. |
27 | Phase already reconciled! |
28 | A material is short and prevents inclusion in the weighing plan. |
29 | Cancellation without return |
30 | Cancellation with return |
31 | Confirmation of 1 cancellation line: |
32 | WO closed: weighing cancellation not allowed |
33 | Weighing already cancelled! |
34 | Incompatibility between packaging and weighing mode |
35 | Re-open the line |
36 | End of container |
37 | Return this WO in the weighing plan? |
38 | Reactivation of the WO in the weighing plan correctly done |
39 | Some excluded materials exist for this OF. Continue? |
40 | Rectification |
41 | Code in use is prohibited at this phase: |
42 | Weighing selection |
43 | Weighing number aleady exists on the line |
44 | Unable to commit. |
45 | Order number already committed. |
46 | Phase already committed! |
47 | Commitment completed for the phase! |
48 | Commitment not completed for the phase... deletion of the commitments for the phase |
49 | Delete all the commitments for the phase? |
50 | Commitment completed for the phase! Yes=Validation No=Deletion? |
51 | Under commitment! |
52 | Number of materials that remain to be reconciled |
53 | Number of materials that remain to be committed |
54 | Work order not reconciled |
55 | Operation selection |
56 | Product selection |
57 | The Entry box is linked with a workstation. The launch from the current station is not authorized |
58 | One or several material(s) are not reconciled |
59 | You need to update your application client to use this functionality |
60 | Number of weighings |
61 | greater than the grid size |
62 | Cannot modify. Work order being weighed |
63 | Material already reconciled. Unable to cancel. |
64 | Material already committed. Unable to cancel. |
65 | Cancellation completed |
66 | Number of weighings still to be entered: |
67 | Proceed with the cancellation? Yes to proceed, No to stop |
68 | Cancellation stopped |
69 | Unable to cancel: the cancellation minimum level is the phase.\The value of parameter ENGAGE has to |
70 | WO not committed, no cancellation to be processed |
71 | Phase not committed, no cancellation to be processed |
72 | Resynchronization of flag Weighing plan |
73 | Work order update |
74 | Process start control completed for the weighing! |
75 | Process start control completed for the weighing! Yes = Validation No = Deletion? |
76 | Weighing process start control not completed... deletion of the weighing process start control |
77 | Process start control per weighing: processing of one weighing at a time |
78 | Reactivation complete |