Number
|
Text
|
|
1
|
Valve already processed
|
|
2
|
Minimum range > or = maximum range
|
|
3
|
Maximum tare > Maximum range
|
|
4
|
Element already present
|
|
5
|
Container type <> SHI file packaging
|
|
6
|
Sentence does not exist or is incorrect!
|
|
7
|
Optional
|
|
8
|
Mandatory
|
|
9
|
Box Procedure
|
|
10
|
Phases
|
|
11
|
Components
|
|
12
|
Weighing history
|
|
13
|
Reconciliation not allowed !
|
|
14
|
Being reconciled !
|
|
15
|
Being weighed
|
|
16
|
Element does not exist !
|
|
17
|
Some materials are not weighed !
|
|
18
|
Reconciliation stopped for the phase ! Yes=Validate No = Delete?
|
|
19
|
Several entries with the same lot = weight mandatory
|
|
20
|
Deletion of all the reconciliations of the phase?
|
|
21
|
Reconciliation of the phase not completed ... deleting the reconciliations of the phase
|
|
22
|
Reconciliation completed for the phase !
|
|
23
|
Nonexistent tracking transaction (parameter WEITRSNUM)
|
|
24
|
Nonexistent tracking counter
|
|
25
|
in weighing process message
|
|
26
|
Order number already reconciled.
|
|
27
|
Phase already reconciled!
|
|
28
|
A material is short and prevents inclusion in the weighing plan.
|
|
29
|
Cancellation without return
|
|
30
|
Cancellation with return
|
|
31
|
Confirmation of 1 cancellation line:
|
|
32
|
WO closed: weighing cancellation not allowed
|
|
33
|
Weighing already cancelled!
|
|
34
|
Incompatibility between packaging and weighing mode
|
|
35
|
Re-open the line
|
|
36
|
End of container
|
|
37
|
Return this WO in the weighing plan?
|
|
38
|
Reactivation of the WO in the weighing plan correctly done
|
|
39
|
Some excluded materials exist for this OF. Continue?
|
|
40
|
Rectification
|
|
41
|
Code in use is prohibited at this phase:
|
|
42
|
Weighing selection
|
|
43
|
Weighing number aleady exists on the line
|
|
44
|
Unable to commit.
|
|
45
|
Order number already committed.
|
|
46
|
Phase already committed!
|
|
47
|
Commitment completed for the phase!
|
|
48
|
Commitment not completed for the phase... deletion of the commitments for the phase
|
|
49
|
Delete all the commitments for the phase?
|
|
50
|
Commitment completed for the phase! Yes=Validation No=Deletion?
|
|
51
|
Under commitment!
|
|
52
|
Number of materials that remain to be reconciled
|
|
53
|
Number of materials that remain to be committed
|
|
54
|
Work order not reconciled
|
|
55
|
Operation selection
|
|
56
|
Product selection
|
|
57
|
The Entry box is linked with a workstation. The launch from the current station is not authorized
|
|
58
|
One or several material(s) are not reconciled
|
|
59
|
You need to update your application client to use this functionality
|
|
60
|
Number of weighings
|
|
61
|
greater than the grid size
|
|
62
|
Cannot modify. Work order being weighed
|
|
63
|
Material already reconciled. Unable to cancel.
|
|
64
|
Material already committed. Unable to cancel.
|
|
65
|
Cancellation completed
|
|
66
|
Number of weighings still to be entered:
|
|
67
|
Proceed with the cancellation? Yes to proceed, No to stop
|
|
68
|
Cancellation stopped
|
|
69
|
Unable to cancel: the cancellation minimum level is the phase.\The value of parameter ENGAGE has to
|
|
70
|
WO not committed, no cancellation to be processed
|
|
71
|
Phase not committed, no cancellation to be processed
|
|
72
|
Resynchronization of flag Weighing plan
|
|
73
|
Work order update
|
|
74
|
Process start control completed for the weighing!
|
|
75
|
Process start control completed for the weighing! Yes = Validation No = Deletion?
|
|
76
|
Weighing process start control not completed... deletion of the weighing process start control
|
|
77
|
Process start control per weighing: processing of one weighing at a time
|
|
78
|
Reactivation complete
|