In single management, this action is called during the modification transaction, just after the Re-write instruction, if this has been completed correctly.
This action is called at the end of creation and modification in management of the types combined or grid, that is to say the write or rewrite loop for the lines has been carried out.
Simple, Grid, Combined
Yes
It is possible to manage the updates of the additional tables for the principal table. It is possible to cancel the modification thanks to the variable GOK being set to 0.
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
MODIF |
|
![]() |
|
![]() |
|
![]() |
|