Set GOK to zero to avoid loading the WO corresponding to the current operation in the [M:OPTK] mask.
This entry point is used to process or not the WO based on criteria related to the current operation OPERATIONS buffer [F:OPS].
If the specific decides not to process the WO/current operation, it must set the GOK variable to zero.
To avoid standard filters on the operation start and end dates and on the current site.
Set GPE to a value other than zero so the filter on the table OPERATIONS [F:OPS]: [F:OPS]OPESTR, [F:OPS]OPEEND and [F:OPS]MFGFCY is not completed.
To replace or complete the filter, you can use the CRITERE variable as follows:
CRITERE = "specific condition"
Gosub LOAD_CRITERE2