Use this entry point to insert additional logic in the creation of a work order immediately before creating the released product lines. You can then initialize specific fields, for example.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFI] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
Depending on the context the [M:MBW1], [M:MBW3] or [M:MBW4] screen classes linked to the consideration of work in progress are loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | Yes | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | Yes | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the following:
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file in work order header creation.
There is no open log file in work order header modification.
This entry point is common to the creation and modification of the work order header. The specific script is unique. The context can be determined by testing the CODMAJ variable:
The [F:MFG] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation/modification of the work order is loaded.
Depending on the context the [M:MBW1], [M:MBW3] or [M:MBW4] screen classes linked to the consideration of work in progress are loaded.
In the following table the Significant content value indicates that the content matches the context.
In work order header creation:
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | Yes | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | Yes | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
In work order header modification:
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | Yes | Work order - operations |
MFGMAT | Yes | Work order - materials |
ITMMVT | Yes | Product-site totals |
WORKSTATIO | Yes | Work centers |
Use this entry point to insert additional logic in the generation of the list of components/by-products associated with a work order.
This entry point is called at the end of the insertion of each component or by-product belonging to the reference BOM.
Additionally, this entry point is used to modify the last line inserted in the standard.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFG] buffer is loaded when calling the entry point.
The [F:MFI] buffer is loaded when calling the entry point.
The [F:MFM] buffer corresponding to the previously created component is loaded when calling the entry point.
The [M:MFGX] screen class is loaded with the previous components when calling the entry point.
The [M:ORDK] screen class is loaded with the previous by-product when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
This entry point has been designed to enable a component or sub-component to be added dynamically to the list of components for the reference BOM. The call is carried out after the addition of each component to the BOM.
The type of link being inserted (component or by-product) is recognized by the [F:BOD]CPNTYP field.
The components are generated directly into the MFGMAT table. At the time of the call, the [MFM] class contains the previous component.
The GMFMORI global variable is used to identify the source function (MFGAUTLIB).
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGTRS | Yes | Production entry transaction |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGMAT | No | Work order - materials |
ITMMASTER | Yes | Products |
MFGOPE | No | Work order - operations |
SCHEDULING | No | Work order scheduling |
MFGPRN | No | Work orders - documents |
ITMMVT | No | Product-site totals |
WORKSTATIO | No | Work centers |
BOM | No | Header BOMS |
BOMD | No | Detail BOMs |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
FACILITY | Yes | Sites |
ORDERS | No | WIP |
OPERATIONS | No | Load in progress |
Use this entry point to insert additional logic in the creation of a work order immediately before creating the component lines. You can then initialize specific fields, for example.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFM] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
Depending on the context the [M:MBW1], [M:MBW3] or [M:MBW4] screen classes linked to the consideration of work in progress are loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | No | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | Yes | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | Yes | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | Yes | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | Yes | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the creation of a work order immediately before creating the operation lines. You can then initialize specific fields, for example.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFO] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
Depending on the context the [M:MBW1], [M:MBW3] or [M:MBW4] screen classes linked to the consideration of work in progress are loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | No | Work orders - products |
MFGOPE | Yes | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | Yes | Load in progress |
ROUTING | Yes | Routings - header |
ROUOPE | Yes | Routing - operations |
ROUSCD | Yes | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the management of a work order when generating the list of components. It is used to replace the standard algorithm in order to load the data from a specific source.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is no open log file.
The [F:MFG] buffer is loaded when calling the entry point.
The [F:MFI] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
This entry point has been designed to enable a complete specific/custom loading of the component grid (MFGX).
The components are inserted in the [M:MFGX] mask.
At the time of the call, the following parameters are available:
Char LFCY Production site
Char LITM Released product
Integer LALT BOM alternative
Date LDAT WO start date
Decimal LQTY Released quantity
Char LLOT Released lot
Integer LOPE Operation number linked to the attached material (propagated via the phantom)
Integer LOFS Usage lead-time (propagation via the phantom)
Integer LRET Return code
If this entry point takes control of the list generation the return code LRET must imperitively have the value 9 in order to bypass the standard script.
The writing of the [M:MFGX] grid contents to the [F:MFM] table is carried out by the standard.
The GMFMORI global variable is used to identify the source function (MFGAUTLIB).
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | No | Work order - header |
MFGITM | No | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the management of a work order when generating the list of operations. It is used to replace the standard algorithm in order to load the data from a specific source.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is no open log file.
The [F:MFG] buffer is loaded when calling the entry point.
The [F:MFI] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
This entry point has been designed to enable a complete specific/custom loading of the operations table ([F:MFO]).
Upon calling, the following parameters are available:
Value Date CDAT Reference date
Value Integer CALT Route alternative
Integer LRET Return code
If this entry point takes control of the list generation the return code LRET must imperatively have the value 9 in order to bypass the standard script.
The GMFMORI global variable is used to identify the source function (MFGAUTLIB).
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | No | Work order - header |
MFGITM | No | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the management of a work order immediately before rewriting the released product lines. You can then initialize specific fields, for example.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFI] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the modification of a work order immediately before rewriting the component lines. You can then initialize specific fields, for example.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFM] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | No | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | Yes | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | Yes | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the modification of a work order immediately before rewriting the operation lines. You can then initialize specific fields, for example.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFO] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | No | Work orders - products |
MFGOPE | Yes | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | Yes | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the creation or modification of a work order when generating or modifying the list of components, in order to pass to products in a category other than "phantom".
The WORITRT local variable (of type integer) identifies the call context.
According to the value of WORITRT the following actions are available:
Example of the specific process for a functioning identical to the phantom functioning:
$ACTION
Case ACTION
When "CROSSTEST" : Gosub ZCROSS
When Default:
Endcase
Return
#####################################################################################
$ZCROSS
If[F:ITM]TCLCOD= "xxx" # Example of condition: that the product category should be xxx
GPE = 2
Case WORITRT: # The call context is tested
When 1: LGHOST = 1 # The context is creation of a component line
When 2: WVISUGHOST = 1 # The context is the modification of the quantity of a component line
Endcase
Endif
Return
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is no open log file.
The [F:MFG] buffer is loaded when calling the entry point.
The [F:MFI] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
In creation (WORITRT = 1), the [F:BOD] buffer is loaded in phase with the context.
In modification (WORITRT = 2), the [F:MFM] buffer is loaded in phase with the context.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | Yes | Sites |
ITMMASTER | Yes | Products |
ITMFACILIT | Yes | Products-sites |
Use this entry point to insert additional logic when creating or releasing a work order to block the list of components of a phantom product from being displayed.
Reset the GPE global variable to 0 to block display of the phantom product component list.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is no open log file.
The [F:MFG], [F:MFI], [F:MFO], [F:MFM] buffers are loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | Yes | Work order - operations |
MFGMAT | Yes | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | Yes | WIP |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | Yes | Sites |
ITMMASTER | Yes | Products |
ITMFACILIT | Yes | Products-sites |
Use this entry point to insert additional logic in the following:
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file in work order creation.
There is no open log file in work order suggestion modification.
This entry point is common to the creation and modification of a work order. The specific script is unique. The context can be determined by testing the CODMAJ variable:
The [F:MFG] buffer is loaded when calling the entry point.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
Depending on the context the [M:MBW1], [M:MBW3] or [M:MBW4] screen classes linked to the consideration of work in progress are loaded.
In the following table the Significant content value indicates that the content matches the context.
In work order creation:
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | Yes | Work order - operations |
MFGMAT | Yes | Work order - materials |
ORDERS | No | WIP |
In work order modification:
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGOPE | Yes | Work order - operations |
MFGMAT | Yes | Work order - materials |
ORDERS | No | WIP |
OPERATIONS | No | Load in progress |
Use this entry point to insert additional logic in the following immediately before integrating the production loss percentage into the calculation of quantities and operating time:
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is no open log file.
The [F:MFO] and [F:ROO] buffers are loaded when calling the entry point.
The GPE variable is used. By default, GPE is set to 0. It must be set to 1 in the specific script linked to the entry point to ignore the loss percentage in the quantity calculation. Upon returning to the standard script the GPE value is tested. If it is different from 0, the line where the quantity is weighted with the loss percentage is bypassed.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGOPE | No | Work order - operations |
WORKSTATIO | No | Work centers |
CPTANALIN | No | Analytical accounting lines |
SCHEDULING | No | Work order scheduling |
Use this entry point to insert additional logic in the deletion of work orders from the Enterprise planning workbench and the Planning workbench.
Recordings in the standard tables have not been deleted when the entry point is called.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is no open log file.
The [M:MFGK] screen class linked to the automatic deletion of work orders is loaded when calling the entry point.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | Yes | Work order - operations |
MFGMAT | Yes | Work order - materials |
WORKSTATIO | Yes | Work centers |
Use this entry point to insert additional logic immediately before creating the work order component allocations in order to bypass the standard allocation to carry out an allocation based on specific criteria.
There is one transaction in progress.
There is no open log file.
The [M:MFGK] mask is loaded when calling the entry point.
The [M:MFGMAT] ([F:MFM]) table is loaded when calling the entry point.
This entry point has been designed to only take control during the creation of the work order component allocations.
It is used to bypass the standard allocation in order to carry out an allocation based on specific criteria. For example, a specific field linked to each component can indicate the allocation type (global, detailed etc.) to be applied to allocate the component.
The GPE variable is used. By default, It is set to 0. It must be set to 1 to bypass the standard processing allocation.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
Use this entry point to insert additional logic at the LOT number calculation level in order to replace the LOT sequence number calculation and/or manage the error message differently.
There is one transaction in progress.
The GOK variable must be set to 0 to cancel the transaction if there is a problem.
There is an open log file.
The [F:MFI] buffer is loaded when calling the entry point. If the script must be different for a by-product, the control of [F:MFI]ITMTYP must be planned in the specific script.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
The GPE variable must be set to 1 to avoid overwriting the [F:MFI]LOT calculated by the specific script.
Call NUMERO(WLOTCOU,[M:MFGK]MFGFCY,[M:MFGK]STRDAT, [F:MFI]ITMREF, [F:MFI]LOT, WIND) From SUBANM
If WIND
Case WIND
When 1: GMESSAGE = WLOTCOU-":"-mess(12,114,1): # Non-existent sequence number counter
When 2: GMESSAGE = WLOTCOU-":"-mess(13,114,1): # Sequence number counter exceeded
When 3: GMESSAGE = WLOTCOU-":"-mess(20,101,1): # Fiscal Year Not Open
When 4: GMESSAGE = WLOTCOU-":"-mess(111,123,1): # Incorrect length
When 99: GMESSAGE = WLOTCOU-":"-mess(135,133,1): # Locked counter
Endcase
If [M:MFGK]AUTOTRT <> 2
Call ERREUR(GMESSAGE) From GESECRAN
Endif
Endif
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the management of a work order when generating the list of components to replace the standard algorithm that selects components according to the work order start date compared with the component validity dates.
Conditions vary depending on the function used: This entry point is triggered from MRP from the automatic generation of a work order (from the Planning workbench) or from the work order creation screen.
By default, the GPE variable is set to 0. Changing its value replaces the value of the variable used (WBOMDATCTL). The value 2 corresponds to the standard script, that is the selection of components according to the calculated start date.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
Use this entry point to insert additional logic in the management of a work order when generating the list of routing operations to replace the standard algorithm that selects operations according to the work order start date compared with the component validity dates.
Conditions vary depending on the function used: This entry point is triggered from the automatic generation of a work order (from the Planning workbench) or from the work order creation screen.
By default, the GPE variable is set to 0. Changing its value replaces the value of the variable used (WROUDATCTL). The value 2 corresponds to the standard script, that is the selection of operations according to the calculated start date.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
This entry point is called when the RELSTRDAT - Level on WO start date change parameter (GPA chapter, WOM group) is set to Yes. Use this entry point to block the list of components from being reloaded from the BOM that is valid on the start date of the work order when the work order start date is different from [M:MFGK]STRDAT.
Conditions vary depending on the function used: This entry point is triggered from the automatic generation of a work order (from the Assignment workbench, Planning workbench, Enterprise planning etc.) when the work order start date is changed.
There is one transaction in progress.
The GPE variable is set to zero by default. Modifying the variable value prevents the leveling of work order components based on the production BOM of the released product.
The [M:MFGK] screen class linked to the automatic creation of the work order is loaded.
In the following table the Significant content value indicates that the content matches the context.
Table | Significant content | Table title |
MFGHEAD | Yes | Work order - header |
MFGITM | Yes | Work orders - products |
MFGOPE | No | Work order - operations |
MFGMAT | No | Work order - materials |
MFGPRN | No | Work orders - documents |
ORDERS | No | WIP |
SCHEDULING | No | Work order scheduling |
OPERATIONS | No | Load in progress |
ROUTING | No | Routings - header |
ROUOPE | No | Routing - operations |
ROUSCD | No | Routing - scheduling operation |
BOM | No | Header BOMs |
BOMD | No | Detail BOMs |
FACILITY | No | Sites |
This entry point is located in the MFGAUTLIB script.
This entry point takes into account the requirements for the workbenches (Enterprise planning workbench, Planning workbench and Grouping) and generates an action called MPECBESOINS. The goal of the MPECBESOINS action is to convert the requirement quantity into physical units.
There is no transaction in process.
There is an open log file.
The call is made for each requirement line taken into account in the workbenches.
The following variables are loaded at the time of the call to the MPECBESOINS action:
The [M:MFGK] screen mask is usable.
The variable and class given above must not be modified.
The following variable must be modified to influence the requirement selection process: