Before calling the entry point, the values of the GPE and LBOMALTTYP variables are set by the standard according to the product-site of the BOM component for which BOM levels are to be calculated:
- GPE indicates if the calculation of all BOM levels must be
GPE= 0 => Yes
GPE =1 => No
- LBOMALTTYP indicates the BOM code type to include in the BOM levels calculation
LBOMALTTYP = 2 => Production
LBOMALTTYP = 3 => Subcontracting
There is no transaction in progress.
VISUBOMROU [VBOR]
In the table below, the significant content flag indicates that the content matches the context (…).
Table | Abbreviation | Significant content | Table title |
ITEM | ITM | Yes | Products |
ITEMFACILTY | ITF | Yes | WIPs |
BOMD | BOD1 | Yes | BOM lines |
BOM | BOH1 | Yes | BOM headers |
ROUOPE | ROO | No | Routing operations |
FACILTY | FCY | Yes | Sites |