General parameters >  Chapter Manufacturing >  Parameter SCHEDHOR (Scheduling horizon)  

Display all Hide all

This parameter is used in the automatic scheduling function.

This function proposes the scheduling or rescheduling of the work orders.

The scheduling is time range constrained: the user must specify up to which end date they wish to schedule the WOs. This "up to end date" is initialized thanks to the SCHEDHOR parameter as follows:

Up to end date  = today's date + SCHEDHOR

Level of localization / Global variable

This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group LOA (Scheduling/Load), The following parameters are also associated with this chapter and group :

The global variable GSCHEDHOR is associated with it.

Functions concerned

FUNMAUTJ automatic scheduling function.

Comments