Purge Null Lots - Implementation
Prerequisite
Activity codes
The following activity codes (sorted by type) may have an impact on the way the function operates :
LOT :
Lot management
General parameters
The following general parameters may change the way the function is working :
Inventory
MARPURLOT (defined at level Folder) : Lot purge security in months
Miscellaneous prerequisite
This process uses the general setup MARPURLOT (purge lots safety margin in months), which is used to determine a maximum purge reference date.
Tables used
The following tables are implemented by the function :
|
Table |
Table description |
|---|---|
|
STOCK [STO] |
Stock |
|
STOLOT [STL] |
Lot numbers |
|
STOQLYD [QLD] |
Quality control detail |
|
STOQLYH [QLH] |
Quality control header |