Prerequisites

Activity codes

The following activity codes (sorted by type) may have an impact on the way the function operates :

Dependent activity codes

These codes are never entered in folder management, because their value is calculated :

  MWC (Container management).

Functional

  ECC :  Product version management

  MWM :  Weighing stations

  UML :  Link qty. in unit of measure

Sizing

  BOW :  BOM processing lines


 When activity code ECC is active:

  • Only components that are not version managed can be selected for deletion.

Tables used

The following tables are implemented by the function :

Table

Table description

BOMD [BOD]

Detail BOMs