Table PJMTSKOPE [PTKO] Tasks - Operations
Version differences : V11 (P22) / V2023R1
Key modification |
---|
Modification | Key | Description | Duplicates | Activity code |
---|---|---|---|---|
Deleted key | PTKO1 | OPPNUM+TASCOD+OPENUM | Yes | |
Deleted key | PTKO2 | OPPNUM+TASCOD | Yes |
Modified fields |
---|
Area | Normal title | Type | Long | Options | Linked table | Link expression | Cancellation | Act | |
---|---|---|---|---|---|---|---|---|---|
OPEDUR(0..0) | Duration | C | 4 | No | |||||
PTETYP(0..0) | Time category | PJTC | PJMTIMCAT | No | |||||
SPLDREF(0..0) | Reference | VPJBIG | No | ALTOPECOD | Routing code ope. | M | 4 | No | BASQTY | Base quantity | QTY | No | BPAADD | Address | ADR | BPADDRESS | 1;BPRNUM;BPAADD | No | BPRNUM | BP | BPR | BPARTNER | No | CAD | Rate | DCB | 6.4 | No | CPLCRG | Actual charge | MD8 | No | CPLLAB | Actual labor W/C | WST | WORKSTATIO | CPLLAB;TASFCY | No | CPLLABNBR | Act. no. labor | C | 2 | No | CPLOPETIM | Actual run time | TIH | No | CPLPRI | Actual price | MD8 | No | CPLQTY | Total completed qty. | QTY | No | CPLUNTTIM | Actual unit time | TIH | No | CPLWST | Actual work center | WST | WORKSTATIO | CPLWST;TASFCY | No | CPLWSTNBR | Actual resources | C | 2 | No | EFF | % efficiency | DCB | 3.3 | No | EQUNUM | Tools | ITM | ITMMASTER | No | EXPNUM | Export number | L | 8 | No | EXTOPETIM | Exp. run time | TIH | No | EXTPRI | Expected price | MD8 | No | EXTSTRQTY | Sub-contract quantity | QTY | No | EXTSTUQTY | Expected STK quantity | QTY | No | EXTUNTTIM | Expected unit time | TIH | No | FITCAPEND | End finite capacity | D | No | FITCAPSTR | Finite capacity start | D | No | FRCSTRDAT | Sched forced scheduling | D | No | FRCSTRHOU | Forced scheduling time | HM | No | FXGNUM | Fixture | A | 20 | No | INFCAPEND | End date | D | No | INFCAPSTR | Start date | D | No | INVQTY | Invoiced qty. | QTY | No | OPELABCOE | Labor r-time fact | DCB | 3.3 | No | OPENUMLEV | Operation suffix | C | 1 | No | OPEPLNNUM | Operation plan | A | 20 | No | OPEROUPCT | Operation image | A | 20 | No | OPESTRCOE | SUSCU/OU factor | COE | No | OPESTUCOE | STK-OPE conversion | COE | No | OPEUOM | Operation UOM | UOM | TABUNIT | No | OPSNUM | Load no. | VCR | No | PIO | Priority | C | 2 | No | POHNUM | Order no. | VCR | No | POPLIN | Line | L | 8 | No | POPSEQ | Sequence | L | 8 | No | PRGNUM | Program | A | 20 | No | QUACPLQTY | Actual QC quantity | QTY | No | REFPRI | Reference price | MD8 | No | REJCPLQTY | Actual rejected qty. | QTY | No | ROOTIMCOD | Run time code | M | 15 | No | ROUOPENUM | Operation no. | OPE | No | RPLIND | Alternate index | C | 3 | No | RSTMAC | Machine restriction | A | 5 | No | SCHGRP | Grouping criterion | A | 15 | No | SCHSBB | Distinction criteria | A | 15 | No | SCOCOD | Subcontract | M | 15 | No | SCOITMREF | Subcontracted prod. | ITM | ITMMASTER | No | SCOLTI | Subcontract LT | LTI | No | SCOPUU | Purchase unit | UOM | TABUNIT | No | SCOWST | Subcontract work C | WST | WORKSTATIO | SCOWST;TASFCY | No | SETLABCOE | Labor time set fac | DCB | 3.3 | No | SHR | Shrinkage in % | DCB | 3.3 | No | SPLCOD | Splitting | M | 15 | No | SPLMAXNBR | Max splits | C | 4 | No | STDLAB | Standard labor | WST | WORKSTATIO | STDLAB;TASFCY | No | STDLABNBR | Std no. labor | C | 2 | No | STDOPENUM | Standard operation | ROT | No | STDOPETIM | Standard run time | TIH | No | STDQTY | Standard quantity | QTY | No | STDUNTTIM | Standard unit time | TIH | No | STDWST | Standard position | WST | WORKSTATIO | STDWST;TASFCY | No | STDWSTNBR | Std no. workcenters | C | 2 | No | TECCRD | Technical sheet | A | 8 | No | TIMCOD | Management unit | M | 15 | No | TIMUOMCOD | Time unit | M | 15 | No | WIPNUM | WIP no. | VCR | No | WSTEFF | Post efficiency | DCB | 3.3 | No | WSTTYP | Work center type | M | 20 | No |