Local menu Title Length Mini Maxi Activity code
2324 Weighing station messages 0 0 0  

Number Text
1 Valve already processed
2 Minimum range > or = maximum range
3 Maximum tare > Maximum range
4 Element already present
5 Container type <> SHI sheet file packaging
6 Sentence does not exist or is incorrect
7 Optional
8 Mandatory
9 Box Procedure
10 Phases
11 Components
12 Weighing history
13 Reconciliation not allowed
14 Being reconciled
15 Being weighed
16 Element does not exist
17 Some materials are not weighed
18 Reconciliation stopped for the phase. Yes = Validate No = Delete
19 Several entries with the same lot = weight mandatory
20 Deletion of all the reconciliations of the phase?
21 Reconciliation of the phase not completed: Deleting the reconciliations of the phase
22 Reconciliation completed for the phase
23 Nonexistent tracking transaction (parameter WEITRSNUM)
24 Nonexistent tracking counter
25 in weighing process message
26 Order number already reconciled
27 Phase already reconciled
28 A material is short and prevents inclusion in the weighing plan
29 Cancellation without return
30 Cancellation with return
31 Confirmation of 1 cancellation line:
32 WO closed: weighing cancellation not allowed
33 Weighing already canceled
34 Incompatibility between packaging and weighing mode
35 Re-open the line
36 End of container
37 Return this WO in the weighing plan?
38 Reactivation of the WO in the weighing plan correctly done
39 Some excluded materials exist for this OF. Continue?
40 Rectification
41 Code in use is prohibited at this phase:
42 Weighing selection
43 Weighing number aleady exists on the line
44 Unable to commit
45 Order number already committed
46 Phase already committed
47 Commitment completed for the phase
48 Commitment not completed for the phase: Deletion of the commitments for the phase
49 Delete all the commitments for the phase?
50 Commitment completed for the phase. Yes = Validate No = Delete
51 Under commitment
52 Number of materials that remain to be reconciled
53 Number of materials that remain to be committed
54 Work order not reconciled
55 Operation selection
56 Product selection
57 The Entry box is linked with a workstation. The launch from the current station is not authorized
58 One or several material(s) are not reconciled
59 You need to update your application client to use this functionality
60 Number of weighings
61 greater than the grid size
62 Cannot modify. Work order being weighed
63 Material already reconciled. Unable to cancel
64 Material already committed. Unable to cancel
65 Cancellation completed
66 Number of weighings still to be entered:
67 Proceed with the cancellation? Yes = Proceed No = Stop
68 Cancellation stopped
69 Unable to cancel: the cancellation minimum level is the phase.\The value of parameter ENGAGE has to
70 WO not committed, no cancellation to be processed
71 Phase not committed, no cancellation to be processed
72 Resynchronization of flag 'Weighing plan'
73 Work order update
74 Process start control completed for the weighing
75 Process start control completed for the weighing. Yes = Validate No = Delete
76 Weighing process start control not completed: Deletion of the weighing process start control
77 Process start control per weighing: processing of one weighing at a time
78 Reactivation complete
79 Reconciliation completed for the container
80 Container already reconciled
81 Reconciliation completed for the work order
82 Reconciliation stopped for the work order. Yes = Validate No = Delete
83 Reconciliation stopped for the container. Yes = Validate No = Delete
84 Delete all reconciliations for the phase?
85 Delete all reconciliations for the container?
86 Delete all reconciliations for the work order?
87 Reconciliations did not complete: Deleting reconciliations
88 Container already committed
89 Weighing number already processed
90 Weigh no.
91 Weighing operator
92 Unable to uncheck. BOM record already exists for this master container.
93 Unable to uncheck. WO record already exists for this master container.