Number
|
Text
|
1
|
Employee ID: $1$ already clocked into a task.
|
2
|
Setup/Run start operation(s) failed.
|
3
|
Operation stop failed.
|
4
|
Operation start failed.
|
5
|
Restart operation(s) failed.
|
6
|
Error updating number of jobs.
|
7
|
Selected operation(s) has an active setup. Do you want to stop the setup to start run activity?
|
8
|
Indirect references
|
9
|
Breaks
|
10
|
Error creating $1$ transaction.
|
11
|
Only one break or exclusive labor transaction allowed at a time.
|
12
|
Employee ID: $1$ not clocked in.
|
13
|
Error stopping $1$ transaction.
|
14
|
Employee ID: $1$ already clocked in.
|
15
|
Clock in transactions must be by employee.
|
16
|
Transaction has already ended.
|
17
|
Error creating auto break transactions.
|
18
|
Employee on a break or exclusive task.
|
19
|
Record skipped due to break or exclusive indirect.
|
20
|
Error in validation.
|
21
|
Error reading record.
|
22
|
Work order is not firm.
|
23
|
Error writing record.
|
24
|
Error updating record.
|
25
|
Rejected qty. cannot be more than completed qty.
|
26
|
Site not valid for selected work center or work center group.
|
27
|
Work center group not valid for selected site or work center.
|
28
|
Work center not valid for selected site or work center group.
|
29
|
Invalid work center type.
|
30
|
Machine included is required for this operation.
|
31
|
Error opening operation $1$.
|
32
|
Error in tracking creation.
|
33
|
Tracking record not generated.
|
34
|
No Setup or Run duration has been entered. Do you want to continue?
|
35
|
Shift date is greater than start date.
|
36
|
Work order is not allocated.
|
37
|
Display limit reached $1$.
|
38
|
Shift date is greater than end date.
|
39
|
Start or end date is mandatory.
|
40
|
User already used on employee ID $1$.
|
41
|
Invalid indirect references.
|
42
|
Labor entry validation
|
43
|
Record skipped due to a previous failure.
|
44
|
Labor center does not exist at the site.
|
45
|
This activity has suspended transactions associated with it. Do you want to reopen those transactio
|
46
|
is not a Labor center.
|
47
|
$1$: is not the same type as the original work center.
|
48
|
Labor center is required.
|
49
|
Labor center cannot be entered if the previous value is blank.
|
50
|
Operation status cannot be closed, excluded, or ordered.
|
51
|
Work order does not exist at the site.
|
52
|
Work center type cannot be subcontract.
|
53
|
Employee is inactive. Current date is past the employee's inactive date.
|
54
|
Employee ID: $1$ is inactive.
|
55
|
Labor center type cannot be subcontract.
|
56
|
Active date is after or equal to inactive date.
|
57
|
Inactive date is before or equal to active date.
|
58
|
Please create shift end time
|
59
|
Please create shift start time
|
60
|
Break cannot end before shift starts.
|
61
|
Break cannot end after shift ends.
|
62
|
Break end time has to be after start time.
|
63
|
Not an autobreak.
|
64
|
Break cannot start before shift starts.
|
65
|
Break cannot start after shift ends.
|
66
|
Break start time has to be before end time.
|
67
|
Error deleting record.
|
68
|
Reload the table and cancel the modifications?
|
69
|
Invalid break.
|
70
|
Employee ID: $1$ has unposted shop floor tracking activities.
|
71
|
$1$: Site must be a production site.
|
72
|
Break must start after the previous break.
|
73
|
$1$ clocked in at $2$
|
74
|
$1$ clocked out at $2$
|
75
|
Employee clock in/out is not enabled for this site.
|
76
|
Employee ID: $1$ is a detailed team.
|
77
|
$1$ started at $2$
|
78
|
$1$ ended at $2$
|
79
|
$1$: Indirect activity already in process.
|
80
|
$1$: Employee not on selected indirect activity.
|
81
|
$1$: Invalid indirect type.
|
82
|
$1$ : Not in process.
|
83
|
Operation already started.
|
84
|
Operation closed.
|
85
|
Run in process for the selected operation.
|
86
|
Open indirects
|
87
|
$1$: Employee is not on break.
|
88
|
Setup in process for the selected operation.
|
89
|
Employee ID: $1$ does not have access to Elapsed labor.
|
90
|
Elapsed $1$ time created.
|
91
|
Duration or Completed qty. is mandatory for elapsed records.
|
92
|
Duration is mandatory for elapsed records.
|
93
|
$1$ Elapsed labor created.
|
94
|
Employee type field cannot be modified when shop floor tracking transactions exist.
|
95
|
Team has shop floor tracking transactions. Modifying number of employees will not affect existing tr
|
96
|
$1$: Employee type must be Detailed team.
|
97
|
$1$: Employee type must be Employee.
|
98
|
$1$: Employee is already part of the team.
|
99
|
Shift code assigned to the employee does not match team shift code.
|
100
|
Employee type cannot be modified when team records exist.
|
101
|
Employee type cannot be modified when employee is part of a team.
|
102
|
Shift code cannot be modified when employee is part of a team.
|
103
|
Shift code has been updated for the team and the employees assigned to the team.
|
104
|
Employee has open activities. Do you want to stop all of the employee’s activities?
|
105
|
Employee cannot be added to the team.
|
106
|
Employee is currently part of team $1$. Do you want to remove from team $2$?
|
107
|
Employee has open activities on a team. Do you want to stop all of the employee’s activities?
|
108
|
Employee is already part of another team.
|
109
|
Shop floor tracking transactions exist. This change could modify the behavior of the transactions. D
|
110
|
Team $1$ does not have any team members available to start an activity.
|
111
|
The site's Clock in/out parameter $1$ must be activated for detailed team employee type.
|
112
|
Open activities have been stopped. Transactions have been reopened with new number of employees.
|
113
|
Deleting a machine record will also delete the labor records associated with the machine.
|
114
|
Number of machines must be zero when primary work center type is labor.
|
115
|
Only Employee and Summary team records can be entered.
|
116
|
Employee $1$ is now included in team $2$ activities.
|
117
|
Deleting a machine record will also delete the labor and machine records associated with the machine
|
118
|
Employee $1$ is not on team $2$.
|
119
|
$1$ : Employee type must be a detailed or summary team.
|
120
|
Site assigned to the employee does not match team site.
|
121
|
Summary team on a break or exclusive task.
|
122
|
Detailed team on a break or exclusive task.
|