No. product lines on contract
This activity code is used to define the maximum number of lines managed in a contract.
Recommended values
A value between 100 and 200 is generally sufficient, but this can be exceeded if necessary.
The activity code POH, that defines the maximum number of products in an order, and the activity code POD, that defines the maximum number of lines in a delivery request, must be sized consistently with this activity code.