SCOALL: Inserting additional filters

This entry point is used to insert additional logic in the allocation of each component linked to the sub-contracting. It is called in all allocation cases (EO management, planning workbench, automatic processes...) and is used notably to activate/de-activate the allocation of a component responding to certain criteria.

Context and operating method

Transaction

There is one transaction in progress.

Log file

There is no open log file.

Available screen and file classes

The SCOMAT ([F:SCM], ITMMASTER ([F:ITM]) and ITMFACILIT ([F:ITF]) tables are loaded at the moment that the entry point is called.

 Use

This entry point has been designed to make it possible to de-activate the allocation of components responding to certain criteria. This de-activation is possible by setting the WRET variable to 9. If the component must be allocated, the WRET variable should be left at its current value.

Open tables

In the grid below, the significant content flag indicates that the content is coherent with the context (...).

Table

Significant content

Table Title

SCOMAT

Yes

Materials

ITMMASTER

Yes

Products

ITMFACILIT

Yes

Products/Site