SUBBOS processing: Component removal
BODMAJ: update of fields on the modified BOM link
This entry point (located just before the rewrite) is used to take over when rewriting the BOM link in order to modify certain fields, to manage the specific fields or to warn, by means of a log file, if a closed WO exists using this BOM.
Note: this processing does not physically delete the record but sets the validity end date to the Application date – 1.
Context and operating mode
Transaction
There is one transaction in progress.
To cancel the transaction if a problem occurs, the GOK variable must be set to 0.
Log file
There is an open log file.
Available screens and file classes
The [F:BOD] buffer is loaded when calling the entry point, but the recording is not yet rewritten.
The BOMSUP0 [M:BOS0] mask is available.
Open tables
In the table below, the significant content flag indicates that the content is in phase with the context.
Table |
Significant content |
Table Title |
BOMD |
Yes |
BOM detail |