This entry point is used to insert logic in the re-write of the link to the replaced BOM in order to modify certain fields or to manage specific/custom fields.
There is one transaction in progress.
To cancel the transaction if there is a problem, the GOK variable must be set to 0.
There is an open log file.
The buffer [F:BOD] is loaded at the moment of the entry point call.
In the table below, the significant content flag indicates that the content is coherent with the context (...).
|
Table |
Significant content |
Table Title |
|
BOM |
Yes |
BOM header |
|
BOMD |
Yes |
BOM detail |
|
FACILIT |
Yes |
Site |