BOSMAJ: update of fields on the replaced service

This entry point is used to insert logic in the re-write of the link to the replaced BOM in order to modify certain fields or to manage specific/custom fields.

Context and operating method

Transaction

There is one transaction in progress.

To cancel the transaction if there is a problem, the GOK variable must be set to 0.

Log file

There is an open log file.

Available screen and file classes

The buffer [F:BOD] is loaded at the moment of the entry point call.

Open tables

In the table below, the significant content flag indicates that the content is coherent with the context (...).

Table

Significant content

Table Title

BOM

Yes

BOM header

BOMD

Yes

BOM detail

FACILIT

Yes

Site