RPLMAT: Leveling WO materials

This entry point is called when the RELSTRDAT - ‘Level on WO start date change’ site parameter is set to Yes. This entry point is used to prohibit the leveling of work order materials when the work order start date is changed (directly or indirectly by modifying the end date).

Context and operating mode

Context description of the call

There is no transaction in progress.

Log file

There is no open log file.

Available screens and file classes

The [M:MFG0], [M:MFG1] and [M:MFG2] screen classes are loaded based on the [L]WMEMDAT value of the WO start date before modification.

Usage

The GPE variable is used. It is set to the value 0 by default.

It must be set to 1 in the specific processing in order to short-circuit the WO materials leveling based on the [M:MFG1]STRDAT value of the WO start date after modification.

Open tables

In the table below, the Significant content flag indicates that the content matches the context.

Table

Significant content

Table title

MFGHEAD

No

WO header

MFGITM

No

Released products

MFGOPE

No

Operations

MFGMAT

No

Materials

MFGPRN

No

Documents

ORDERS

No

WIPs

SCHEDULING

No

Scheduling

OPERATIONS

No

Load WIP

ROUTING

No

Routing header

ROUOPE

No

Routing operations

ROUSCD

No

Routing - Scheduling

BOM

No

Bill of materials

BOMD

No

BOM lines

FACILITY

No

Site

ITMMASTER

No

Product

ITMFACILIT

No

Product-site