SUBMTKA processing: Production tracking
UPDSCD: Scheduling update
Use this entry point to authorize (or not) the scheduling re-calculation following an operation tracking creation.
Context and operating mode
Transaction
There is one transaction in progress.
Log file
There is an open log file.
Use
Set GPE to 1 to prevent a re-calculation of the scheduling.
Open tables
In the table below, the significant content flag indicates that the content is in phase with the context.
Table |
Significant content |
Table Title |
MFGHEADTRK |
Yes |
Tracking header |
MFGOPETRK |
No |
Operation tracking |
CUSSRT: Specific sort for the material grid
Use this entry point to take over at the end of the material grid loading, just before the recordings are sorted, in order for example to sort the lines according to an order that was not planned in standard mode.
Setting the GPE variable to the value 1 is used to not carry out the standard sort.
Context and operating mode
Transaction
There is one transaction in progress.
Log file
There is an open log file.
Use
Set GPE to 1 to prevent the standard sorting of components.
Open tables
In the table below, the significant content flag indicates that the content is in phase with the context.
Table |
Significant content |
Table Title |
MFGHEADTRK |
Yes |
Tracking header |
MFGMATTRK |
No |
Material tracking |
AFFTRA: Possibility not to display the log file
Use this entry point to delete the display of the generated log file on tracking plan validation.
The GPE global variable must be reset to 0 to prevent the display.
Context and operating mode
Transaction
There is no transaction in progress.
Log file
There is an open log file.