SUBSCOA processing: Subcontract orders
UPDMATFCY: Component site update
Use this entry point to take over in subcontract order management upon loading the components in order to determine which site to use. A receipt site that will be different from the purchase site can thus be planned.
Context and operating mode
Description of the call context
There is no transaction in progress.
Log file
There is no open log file.
Available screen and file class
The [M:SCO0],[M:SCO1],[M:SCO2] and [M:SCO3] screens are being loaded.
Use
The GPE variable is used. It is set to the value 0 by default. It will need to be set to 1 in the specific processing linked to the entry point in order not to transfer the site on components loaded according to the BOM.
Open tables
In the table below, the significant content flag indicates that the content is in phase with the context.
Table |
Significant content |
Table Title |
SCOHEAD |
No |
EO header |
SCOITM |
No |
Subcontracted product |
SCOSRV |
No |
Department |
SCOMAT |
No |
Materials |
ORDERS |
No |
WIPs |
BOM |
No |
BOMs |
BOMD |
Yes |
BOM lines |
FACILITY |
No |
Site |