UPDMATFCY: Component site update

Use this entry point to take over in subcontract order management upon loading the components in order to determine which site to use. A receipt site that will be different from the purchase site can thus be planned.

Context and operating mode

Description of the call context

There is no transaction in progress.

Log file

There is no open log file.

Available screen and file class

The [M:SCO0],[M:SCO1],[M:SCO2] and [M:SCO3] screens are being loaded.

Use

The GPE variable is used. It is set to the value 0 by default. It will need to be set to 1 in the specific processing linked to the entry point in order not to transfer the site on components loaded according to the BOM.

Open tables

In the table below, the significant content flag indicates that the content is in phase with the context.

Table

Significant content

Table Title

SCOHEAD

No

EO header

SCOITM

No

Subcontracted product

SCOSRV

No

Department

SCOMAT

No

Materials

ORDERS

No

WIPs

BOM

No

BOMs

BOMD

Yes

BOM lines

FACILITY

No

Site