BOMDRL: Calculate all BOM levels

Use this entry point to force or stop the calculation of all BOM levels (by modifying GPE) or to change the related BOM code type (by modifying WALTTYPR).

BOMDRL: Calculate all BOM levels

Before calling the entry point, the values of the GPE and WALTTYPR variables are set by the standard according to the product-site of the BOM component for which BOM levels are to be calculated:

- GPE indicates if the calculation of all BOM levels must be

GPE= 0 => Yes

GPE =1 => No

- WALTTYPR indicates the BOM code type to include in the BOM levels calculation

WALTTYPR = 2 => Production

WALTTYPR = 3 => Subcontracting

Transaction

There is no transaction in progress.

Available screens

VISUBOMG [VBOG]

Open tables

In the table below, the significant content flag indicates that the content matches the context (…).


Table

Abbreviation

Significant content

Table title

ITMMASTER

ITM

Yes

Products

ITMFACILIT

ITF

Yes

Product-sites

BOMD

BODW

Yes

BOM lines

BOM

BOH1

Yes

BOM headers

FACILITY

FCY

Yes

Sites