VISUBOMROU script: Production slip
BOMDRL: Calculate all BOM levels
BOMDRL: Calculate all BOM levels
Before calling the entry point, the values of the GPE and WALTTYPR variables are set by the standard according to the product-site of the BOM component for which BOM levels are to be calculated:
- GPE indicates if the calculation of all BOM levels must be
GPE= 0 => Yes
GPE =1 => No
- LBOMALTTYP indicates the BOM code type to include in the BOM levels calculation
LBOMALTTYP = 2 => Production
LBOMALTTYP = 3 => Subcontracting
Transaction
There is no transaction in progress.
Available screens
VISUBOMROU [VBOR]
Open tables
In the table below, the significant content flag indicates that the content matches the context (…).
Table |
Abbreviation |
Significant content |
Table title |
ITMMASTER |
ITM |
Yes |
Products |
ITMFACILITY |
ITF |
Yes |
Product-sites |
BOMD |
BOD1 |
Yes |
BOM lines |
BOM |
BOH1 |
Yes |
BOM headers |
ROUOPE |
ROO |
No |
Routing operations |
FACILITY |
FCY |
Yes |
Sites |