Process VISUMFG : View BOM Link
CROSSTEST : Possibility to pass through the product category other than phantom
This entry point is used to insert additional logic in the display of BOMs from the WO management in order to allow the transfer of products in a category other than "phantom".
Context and operating method
Use
The setting the "GPE" variable to a value of 1 is used to force this transfer in a systematic way.
Transaction
There is no transaction in progress.
Log file
There is no open log file.
Available screen and file classes
The buffers [F :ITM](product) and [F :BOD1](BOM detail) are loaded at the time of the call to the entry point.
Open tables
In the table below, the significant content flag indicates that the content is coherent with the context (...).
Table |
Significant content |
Table Title |
MFGHEAD |
No |
WO header |
MFGITM |
No |
Released products |
MFGOPE |
No |
Operations |
MFGMAT |
No |
Materials |
MFGPRN |
No |
Documents |
ORDERS |
No |
Pending movements |
SCHEDULING |
No |
Scheduling |
OPERATIONS |
No |
Loading |
ROUTING |
No |
Routing header |
ROUOPE |
No |
Routing operations |
ROUSCD |
No |
Route - Scheduling |
BOM |
No |
BOMs |
BOMD |
Yes |
BOM lines |
FACILITY |
No |
Site |
ITMMASTER |
Yes |
Product |