Appendix 1: Example project
Rotating tower crane
This example demonstrates elements of a Project management project that would be implemented to deliver a rotating tower crane to a customer.
The following diagram shows the main components of a rotating tower crane (RTC).
Structure
The first stage of this example project would be to draw up a structure diagram for producing the rotating tower crane above.
This example project will be structured using the three master phases that need to be tracked from a financial perspective: a "design" phase, a "manufacturing" phase and an "installation" phase.
- The "manufacturing" phase incorporates the manufacturing of the major components of the crane.
- The "installation" phase in this example includes both assembly and quality assurance elements.
An example Project management structure diagram is provided below.
The project details must be created in the Project management function (GESPJM).
A cost structure to track costs is defined.
An operational structure to track replenishments and delays is defined.
The following sample screen represents a section of the operational structure from the structure diagram.
- The labor task T10101 is to manage the assembly of the T10101A (Crane tower unit) task. Time planned and consumed, and the costs can be tracked using this task.
- Tasks T10102-4 are the material tasks. In this example these tasks manage the product deliveries.
The labor tasks for the project are represented by the following example diagram:
The material tasks for the project are represented by the following example diagram:
This appendix has demonstrated that whilst both structures can be different, for the simplest projects a single structure can be defined. This is described further in Project budgets.
Reference data
Project cost types
Cost type |
Description |
Type |
Labor rate |
Sold product |
Cost type group |
---|---|---|---|---|---|
EU-DMECHA |
Mechanical design |
Labor |
55/hour |
|
Design |
EU-DELECT |
Electronic design |
Labor |
60/hour |
|
Design |
EU-ASSEMBLY |
Assembly |
Labor |
600/hour |
|
Assembly |
EU-QUALITY |
Quality |
Labor |
40/hour |
|
Quality |
EU-PROJECT |
Project management |
Labor |
70/hour |
PROJECT |
Project |
EXPENSE |
Expenses |
NA |
|
|
Project |
MATSPE |
Special materials |
Material |
|
|
Product on demand |
MATMECA |
Mechanical materials |
Material |
|
|
Product on demand |
MATSTOCK |
Stock materials |
Material |
|
|
Product on stock |
MATBULK |
Bulk materials |
Material |
|
|
Product on stock |
PURDPT |
Purchase department |
Provision |
|
|
Project |
Work centers (including cost type link)
Work center |
Description |
Cost type |
Setup rate |
Labor/Machine rate |
Rate per hour (Costing dimension) |
---|---|---|---|---|---|
LAB010 |
RTC Crane mechanic |
EU-ASSEMBLY |
500 |
80 |
580 |
LAB011 |
RTC Mechanical operator |
EU-ASSEMBLY |
500 |
90 |
590 |
LAB012 |
RTC Crane foreman |
EU-ASSEMBLY |
400 |
100 |
500 |
MAC097 |
RTC Metal cutting |
|
1000 |
810 |
1810 |
MAC098 |
RTC Welding robot |
|
300 |
500 |
800 |
Bill of materials (BOM) and product
Component |
Description |
Qty. |
Reorder |
Product management mode |
Cost type |
Project link |
Deliverable? |
Sold product? |
---|---|---|---|---|---|---|---|---|
COM100 |
RTC Rotating Tower Crane 40M |
1 |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
|
Yes |
.. COM101 |
RTC Crane Tower Unit 40M |
1 |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
|
|
.. .. COM102 |
RTC Lattice Mast Element |
8 |
Manufacturing |
By order |
|
Material task |
Yes |
|
.. .. .. RAW015 |
RTC Metal brace |
192 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. RAW016 |
RTC Braces fixture |
320 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. RAW017 |
RTC Screw |
640 |
Purchase |
Available stock |
MATBULK |
|
|
|
.. .. .. RAW906 |
Paint, yellow |
16 |
Purchase |
Available stock |
MATSTOCK |
|
|
|
.. .. RAW017 |
RTC Screw |
80 |
Purchase |
Available stock |
MATBULK |
|
|
|
.. .. COM103 |
RTC Tower Rotating Assembly |
1 |
Manufacturing |
By order |
|
Material task |
Yes |
|
.. .. .. RMP004 |
RTC Drive sprocket wheel |
5 |
Purchase |
By order |
MATSPE |
|
|
|
.. .. .. RMP001 |
RTC Rotating drive |
1 |
Purchase |
By order |
MATSPE |
|
|
|
.. .. COM104 |
RTC Crane Cabin |
1 |
Manufacturing |
By order |
|
Material task |
Yes |
|
.. .. .. COM105 |
RTC Crane Cabin Chassis |
1 |
Manufacturing |
By order |
|
|
|
|
.. .. .. .. RAW015 |
RTC Metal brace |
60 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. .. RAW016 |
RTC Braces fixture |
60 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. .. RAW017 |
RTC Screw |
100 |
Purchase |
Available stock |
MATBULK |
|
|
|
.. .. .. .. RAW019 |
RTC Safety glass pane |
8 |
Purchase |
Available stock |
MATSTOCK |
|
|
|
.. .. .. RAW020 |
RTC Crane drivers seat |
1 |
Purchase |
Available stock |
MATSTOCK |
|
|
|
.. .. .. RMP002 |
RTC Crane control panel |
1 |
Purchase |
By order |
MATSPE |
|
|
|
.. COM106 |
RTC Crane Jib Assembly 30M |
1 |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
|
|
.. .. COM107 |
RTC Loading Jib 30M |
1 |
Manufacturing |
By order |
|
Material task |
Yes |
|
.. .. .. COM110 |
RTC Loading Jib Element |
6 |
Manufacturing |
By order |
|
|
|
|
.. .. .. .. RAW015 |
RTC Metal brace |
108 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. .. RAW016 |
RTC Braces fixture |
180 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. .. RAW017 |
RTC Screw |
360 |
Purchase |
Available stock |
MATBULK |
|
|
|
.. .. .. .. RAW906 |
Paint, yellow |
12 |
Purchase |
Available stock |
MATSTOCK |
|
|
|
.. .. .. RAW017 |
RTC Screw |
60 |
Purchase |
Available stock |
MATBULK |
|
|
|
.. .. .. RMP003 |
RTC Crane trolly |
1 |
Purchase |
By order |
MATSPE |
|
|
|
.. .. .. RAW025 |
RTC Drawbar to fix jib |
2 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. COM108 |
RTC Counterweight Jib 10M |
1 |
Manufacturing |
By order |
|
Material task |
Yes |
|
.. .. .. RAW015 |
RTC Metal brace |
180 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. .. RAW021 |
RTC Counterbalance concrete |
5 |
Purchase |
By order |
MATSPE |
|
|
|
.. .. .. RAW025 |
RTC Drawbar to fix jib |
2 |
Purchase |
Available stock |
MATMECA |
|
|
|
.. COM109 |
RTC Cable Pulling Assembly |
1 |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
|
|
.. .. RMP005 |
RTC Crane engine |
1 |
Purchase |
By order |
MATSPE |
Material task |
Yes |
|
.. .. RAW023 |
RTC Pulling cable |
1 |
Purchase |
Available stock |
MATSTOCK |
Material task |
Yes |
|
.. .. RAW024 |
RTC Hook |
1 |
Purchase |
Available stock |
MATSTOCK |
Material task |
Yes |
|
Bill of materials (BOM) and work center
Component |
Description |
Reorder |
Product management mode |
Cost type |
Project link |
Work center |
Material standard cost |
---|---|---|---|---|---|---|---|
COM100 |
RTC Rotating Tower Crane |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
LAB010 |
|
.. COM101 |
RTC Crane Tower Unit 40M |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
LAB010 |
|
.. .. COM102 |
RTC Lattice Mast Element |
Manufacturing |
By order |
|
Material task |
LAB010 |
|
.. .. .. RAW015 |
RTC Metal brace |
Purchase |
Available stock |
MATMECA |
|
|
1000 |
.. .. .. RAW016 |
RTC Braces fixture |
Purchase |
Available stock |
MATMECA |
|
|
40 |
.. .. .. RAW017 |
RTC Screw |
Purchase |
Available stock |
MATBULK |
|
|
10 |
.. .. .. RAW906 |
Paint, yellow |
Purchase |
Available stock |
MATSTOCK |
|
|
20 |
.. .. RAW017 |
RTC Screw |
Purchase |
Available stock |
MATBULK |
|
|
10 |
.. .. COM103 |
RTC Tower Rotating Assembly |
Manufacturing |
By order |
|
Material task |
LAB010 |
|
.. .. .. RMP004 |
RTC Drive sprocket wheel |
Purchase |
By order |
MATSPE |
|
|
3000 |
.. .. .. RMP001 |
RTC Rotating drive |
Purchase |
By order |
MATSPE |
|
|
50000 |
.. .. COM104 |
RTC Crane Cabin |
Manufacturing |
By order |
|
Material task |
LAB010 |
|
.. .. .. COM105 |
RTC Crane Cabin Chassis |
Manufacturing |
By order |
|
|
LAB010 |
|
.. .. .. .. RAW015 |
RTC Metal brace |
Purchase |
Available stock |
MATMECA |
|
|
1000 |
.. .. .. .. RAW016 |
RTC Braces fixture |
Purchase |
Available stock |
MATMECA |
|
|
40 |
.. .. .. .. RAW017 |
RTC Screw |
Purchase |
Available stock |
MATBULK |
|
|
10 |
.. .. .. .. RAW019 |
RTC Safety glass pane |
Purchase |
Available stock |
MATSTOCK |
|
|
1000 |
.. .. .. RAW020 |
RTC Crane drivers seat |
Purchase |
Available stock |
MATSTOCK |
|
|
200 |
.. .. .. RMP002 |
RTC Crane control panel |
Purchase |
By order |
MATSPE |
|
|
500 |
.. COM106 |
RTC Crane Jib Assembly 30 |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
LAB011 |
|
.. .. COM107 |
RTC Loading Jib 30M |
Manufacturing |
By order |
|
Material task |
LAB010 |
|
.. .. .. COM110 |
RTC Loading Jib Element |
Manufacturing |
By order |
|
|
LAB010 |
|
.. .. .. .. RAW015 |
RTC Metal brace |
Purchase |
Available stock |
MATMECA |
|
|
1000 |
.. .. .. .. RAW016 |
RTC Braces fixture |
Purchase |
Available stock |
MATMECA |
|
|
40 |
.. .. .. .. RAW017 |
RTC Screw |
Purchase |
Available stock |
MATBULK |
|
|
10 |
.. .. .. .. RAW906 |
Paint, yellow |
Purchase |
Available stock |
MATSTOCK |
|
|
20 |
.. .. .. RAW017 |
RTC Screw |
Purchase |
Available stock |
MATBULK |
|
|
10 |
.. .. .. RMP003 |
RTC Crane trolley |
Purchase |
By order |
MATSPE |
|
|
5000 |
.. .. .. RAW025 |
RTC Drawbar to fix jib |
Purchase |
Available stock |
MATMECA |
|
|
|
.. .. COM108 |
RTC Counterweight Jib 10M |
Manufacturing |
By order |
|
Material task |
LAB010 |
|
.. .. .. RAW015 |
RTC Metal Brace |
Purchase |
Available stock |
MATMECA |
|
|
1000 |
.. .. .. RAW021 |
RTC Counterbalance concrete |
Purchase |
By order |
MATSPE |
|
|
2000 |
.. .. .. RAW025 |
RTC Drawbar to fix Jib |
Purchase |
Available stock |
MATMECA |
|
|
2000 |
.. COM109 |
RTC Cable Pulling Assembly |
Manufacturing |
Not managed, Available stock |
|
Labor task (assembly) |
LAB010 |
|
.. .. RMP005 |
RTC Crane engine |
Purchase |
By order |
MATSPE |
Material task |
|
10000 |
.. .. RAW023 |
RTC Pulling cable |
Purchase |
Available stock |
MATSTOCK |
Material task |
|
5000 |
.. .. RAW024 |
RTC Hook |
Purchase |
Available stock |
MATSTOCK |
Material task |
|
4000 |