Automated Data Collection for Shop floor tracking
GPA chapter / CTL group
- CTLOPEPRE - Expected operation tracking co
- DOSFAB - Printing WO documents
- MTKALLMGT - Allocation to the WO mandatory
- SFTELPDEF - Automated Data Collection (ADC) elapsed time default
Clock in
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Clock in
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
When you select Ok a screen displays your clock in time.
Clock out
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Clock out
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Select Ok to clock out and close all open activities.
Break start
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Break start
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
Break code. Enter or use Sel to select a break code.
Elapsed. The default value is based on the value provided by the SFTELPDEF - Automated Data Collection (ADC) elapsed time default parameter (GPA chapter, CTL group). A Yes value allows you to enter the duration.
When you select Ok a screen confirms that your break started.
Break stop
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Break stop
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
Break code. Defaults to the current break code.
Select Ok to stop the activity. A screen displays the end time.
Setup start
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Setup start
The following fields are disabled if the primary work center is a labor type:
- Mach
- Lab WC - if the primary work center is a labor type, and if the original operation does not have a secondary work center.
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
WO. Enter or scan the work order number. You can also use Sel to select an open work order at the production site.
Work orders observe the following rules based on parameter settings:
- If the MTKALLMGT – Allocation to the WO mandatory parameter (GPA chapter, CTL group) is set to Yes, you cannot track the work order if materials have not been allocated.
- If the DOSFAB – Printing WO documents parameter (GPA chapter, CTL group) is set to Mandatory, the work order must be printed before tracking.
Op. Enter or use Sel to select a valid operation for the work order. A valid operation meets the following conditions:
- It cannot be closed, excluded, or ordered.
- It does not contain a labor work center that is a subcontract type.
- It is not already closed.
- It is not a subcontract operation.
Mach. This field defaults to the number of resources for the operation for the work order, or 0 (zero) if an activity is in progress for the selected operation. Enter the number of machines other than 0 when the primary work center is a machine type and the labor work center is blank.
WC. This field defaults to the work center assigned to the operation. You can enter or use Sel to select a work center.
Lab WC. This field defaults to the labor work center assigned to the operation. You can enter or use Sel to select a labor work center.
When you select Ok to start the activity a screen displays the start time.
Setup stop
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Setup stop
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
WO. Enter or use Sel to select an open work order at the site.
Op. Enter or use Sel to select an active operation for the work order.
Select Ok to stop the activity.
Run start
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Run start
The following fields are disabled if the primary work center is a labor type:
- Mach
- Lab WC - if the primary work center is a labor type, and if the original operation does not have a secondary work center.
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
WO. Enter or scan the work order number. You can also use Sel to select an open work order at the production site.
Work orders observe the following rules based on parameter settings:
- If the MTKALLMGT – Allocation to the WO mandatory parameter (GPA chapter, CTL group) is set to Yes, you cannot track the work order if materials have not been allocated.
- If the DOSFAB – Printing WO documents parameter (GPA chapter, CTL group) is set to Mandatory, the work order must be printed before tracking.
Op. Enter or use Sel to select a valid operation for the work order. A valid operation meets the following conditions:
- It cannot be closed, excluded, or ordered.
- It does not contain a labor work center that is a subcontract type.
- It is not already closed.
- It is not a subcontract operation.
Mach. This field defaults to the number of resources for the operation for the work order, or 0 (zero) if an activity is in progress for the selected operation. Enter the number of machines other than 0 when the primary work center is a machine type and the labor work center is blank.
WC. This field defaults to the work center assigned to the operation. You can enter or use Sel to select a work center.
Lab WC. This field defaults to the labor work center assigned to the operation. You can enter or use Sel to select a labor work center.
When you select Ok to start the operation a screen displays the start time.
Run stop
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Run stop
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
WO. Enter or use Sel to select an open work order at the site.
Op. Enter or use Sel to select an operation for the work order.
Compl. Enter the completed quantity.
Rej. Enter the rejected quantity when the completed quantity is more than 0 (zero). You cannot enter a value greater than the completed quantity.
Rej code. Enter or use Sel to provide a reason for the rejection. This field is not available if the rejected quantity is 0 (zero).
Close. Enter Yes to close an operation. This field defaults to Yes when the planned quantity for an operation is complete.
Select Ok to stop the operation.
Indirect start
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Indirect start
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
Ind code. Enter or use Sel to select an Indirect code.
Elapsed. The default value is based on the value provided by the SFTELPDEF - Automated Data Collection (ADC) elapsed time default parameter (GPA chapter, CTL group). A Yes value allows you to enter the duration.
Duration. Enter the time in minutes for the activity.
When you select Ok a screen confirms that the elapsed indirect time was created.
Indirect stop
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Indirect stop
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
Ind code. Defaults to the current Indirect code.
Select Ok to stop the activity.
Elapsed labor
Open: Automated Data Collection > Manufacturing > Shop floor tracking > Elapsed labor
The following fields are disabled if the primary work center is a labor type:
- Mach
- Lab WC - if the primary work center is a labor type, and if the original operation does not have a secondary work center.
Emp. Type in one of the following:
- Your Employee ID.
- For Summary teams, the Employee ID for the team.
Site. Leave the default site defined on your user profile. Alternatively, you can enter or use Sel to select a production site.
WO. Enter or scan the work order number. You can also use Sel to select an open work order at the production site.
Work orders observe the following rules based on parameter settings:
- If the MTKALLMGT – Allocation to the WO mandatory parameter (GPA chapter, CTL group) is set to Yes, you cannot track the work order if materials have not been allocated.
- If the DOSFAB – Printing WO documents parameter (GPA chapter, CTL group) is set to Mandatory, the work order must be printed before tracking.
Op. Enter or use Sel to select a valid operation for the work order. A valid operation meets the following conditions:
- It cannot be closed, excluded, or ordered.
- It does not contain a labor work center that is a subcontract type.
- It is not already closed.
- It is not a subcontract operation.
Mach. This field defaults to the number of resources for the operation for the work order, or 0 (zero) if an activity is in progress for the selected operation. Enter the number of machines other than 0 when the primary work center is a machine type and the labor work center is blank.
WC. This field defaults to the work center assigned to the operation. You can enter or use Sel to select a work center.
Lab WC. This field defaults to the labor work center assigned to the operation. You can enter or use Sel to select a labor work center.
Setup. Enter the total amount of time spent setting up for the activity, in hours.
Run. Enter the total amount of time spent on the activity, in hours.
Compl. Enter the completed quantity.
Rej. Enter the rejected quantity when the completed quantity is more than 0 (zero). You cannot enter a value greater than the completed quantity.
Rej code. Enter or use Sel to provide a reason for the rejection. This field is not available if the rejected quantity is 0 (zero).
Close. Enter Yes to close an operation. This field defaults to Yes when the planned quantity for an operation is complete.
When you select Ok a screen confirms that the elapsed labor was created.