Activity codes >  Module Fixed Assets >  Activity Code RNW (No. of renewed assets)  

Display all Hide all

This activity code is used in the function Preparation to renewal of assets in concession.

It makes it possible to indicate the maximum number of lines contained in the grid of assets to renew: this number of lines corresponds to the maximum number of assets that can be renewed by a renewing asset.