This function is used to carry out a mass allocation processing of the materials linked to the production for a given site, a given period and a selection of a work orders.

This processing can allocate material in a global or detailed manner.

It is possible to specify the priority criteria to be taken into account between the various WOs in the selection for the allocation of materials.

Prerequisite

See also Refer to documentation Implementation

Screen management

Entry screen

Selection criteria

  • Production site: The site associated with the user is suggested by default.
  • Requirement date until: This field is used to select the materials which requirement date is prior to the date mentioned. By default this date is initialized to the current date.
  • Priority to shortage quantities: this choice is used to allocate in priority the WOs with shortage materials, then to allocate the WOs without shortage.
  • Selection order: The purpose here is to specify the order in which the allocations must be performed for the various WOs (by start date, the WOs are processed in the order of their start dates.) For a similar start date, the priority code of the WO is taken into account. By priority code, the WOs are processed by decreasing priority order (Very urgent, Urgent, Normal). With an equal priority level, the system examines the material requirement date.
  • Allocation type: Global or detailed allocation (the detailed allocation processes the non-allocated materials but also the already globally allocated materials, and the shortages. )

Start/End ranges

These ranges are used to select the materials to be processed. The possible ranges are:

  • Priority
  • Work order no.
  • Project
  • Destination
  • Order number
  • Released product
  • Material

At the end of the processing, a log file can be printed.

This log mentions the allocated quantities and quantity shortages by work order and material.

Batch task

This function can be run in batch mode. The standard task FUMAUTA is provided for that purpose.

Error messages

In addition to the generic error messages, the following messages can appear during the entry :

The end range is prior to the start range

Coherency check on the selection ranges.

Modification in process on another workstation

This message appears on the end of processing log if a lock problem forbids the update.

Rollback following an error in the transaction

Serious access problem to the database.

No material processed

This message is displayed if no allocation could be carried out.

Problem in the table XXXXXXXX

Serious access problem to the database.

Tables used

See also Refer to documentation Implementation