This function is used to determine the production cost (PC) for a work order and to underline the variance between the actual cost and the standard cost (cost based on the data in the BOM) or the cost based on the work order data.
SEEINFOIf the processing is not performed in a simulation but in a actual situation, the work order must be closed.

The PC calculation can be carried out on a single work order or according to the conditions expressed in a filter in the SCOHEAD, SCOITM and MFGWIP tables.

The PC calculation is based on the WIPCOST table which is fed by input of the subcontract product receptions (material consumption). The standard cost variance records, the adjustment and the WIP balance can be created.

A print-out can be requested at the end of the calculation.

A certain number of inquiries are available to view the cost price history for a product, to compare the PC with respect to the other cost types for the site or for another site.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

Entry screen

Selection

A site and then a work order must be specified.

In the Order no. field, 2 options can be accessed by right click:

  • Selection: this option displays the list of closed subcontract orders.
  • EO filter: displays a window used to do a selection using a filter on the SCOHEAD table of subcontract order header.
    The selection based on a filter is used to launch a calculation for the work orders that meet the filter criteria. For these choices the filter box is checked.
Variance origin

The basis for the calculation of the planned subcontract cost, must be specified:

  • Standard data: specifies that the planned PC will be determined using a standard basis (data of the routing and the BOM).
    Caution: the routing and the BOM must be of cost type.
  • Subcontract order: specifies that the planned PC will be created from the work order data.
Printing
  • No: No print-out will be proposed when the PC is calculated.
  • Detail: A detailed print-out of the PC will be proposed at the end of the calculation.
  • Summary: A print-out summing up the calculations will be suggested.
Flexible budget

The flexible budget flag is used to correct the calculation database planned with respect to the Planned/Actual ratio.

Batch task

This function can be run in batch mode, but no dedicated standard task is delivered to run it.

Error messages

The only error messages are the generic ones.