Calculate actual sbcont cost
This function is used to determine the production cost (PC) for a work order and to underline the variance between the actual cost and the standard cost (cost based on the data in the BOM) or the cost based on the work order data.
If the processing is not performed in a simulation but in a actual situation, the work order must be closed.
The PC calculation can be carried out on a single work order or according to the conditions expressed in a filter in the SCOHEAD, SCOITM and MFGWIP tables.
The PC calculation is based on the WIPCOST table which is fed by input of the subcontract product receptions (material consumption). The standard cost variance records, the adjustment and the WIP balance can be created.
A print-out can be requested at the end of the calculation.
A certain number of inquiries are available to view the cost price history for a product, to compare the PC with respect to the other cost types for the site or for another site.
Prerequisites
Refer to documentation Implementation
Screen management
Entry screen
Selection
A site and then a work order must be specified.
In the Order no. field, 2 options can be accessed by right click:
- Selection: this option displays the list of closed subcontract orders.
- EO filter: displays a window used to do a selection using a filter on the SCOHEAD table of subcontract order header.
The selection based on a filter is used to launch a calculation for the work orders that meet the filter criteria. For these choices the filter box is checked.
Variance origin
The basis for the calculation of the planned subcontract cost, must be specified:
- Standard data: specifies that the planned PC will be determined using a standard basis (data of the routing and the BOM).
Caution: the routing and the BOM must be of cost type. - Subcontract order: specifies that the planned PC will be created from the work order data.
Printing
- No: No print-out will be proposed when the PC is calculated.
- Detail: A detailed print-out of the PC will be proposed at the end of the calculation.
- Summary: A print-out summing up the calculations will be suggested.
Flexible budget
The flexible budget flag is used to correct the calculation database planned with respect to the Planned/Actual ratio.
Selection
Simulation (field SIMFLG) |
Cost calculation (field PRF1) |
If this check box is selected, the subcontract orders whose PCs have never been calculated will be processed. |
Cost update (field PRF2) |
If this check box is selected, the subcontract orders whose PCs have already been calculated will also be processed. It is thus possible to re-calculate a PC after the first calculation. |
Receiving site (field STOFCY) |
Production site This is initialized by default with the normal production site for the user. |
Order no. (field VCRNUM) |
Subcontract order or filter number. It is possible:
|
Printing
Report (field PRNCOD) |
The printing of the cost price can be: |
Update planned/actual ratio (field FLXBUD) |
The flexible budget flag is used to correct the calculation database planned with respect to the Planned/Actual ratio. |
Variance source (field ORIDEVCLC) |
This field is used to specify the calculation basis for the planned production cost:
|
Print expected cost (field PRVCSTPRT) |
Print of non-achieved planned (field EDIPRV) |