This function is used to setup the interface with the planning software and advanced scheduling (APS): PREACTOR.
This setup is used to manage, through data files in the .csv format, the flows coming from and designed for PREACTOR.
This flows, concerning the Manufacturing module, are the following:
Flow X3 to PREACTOR:
Flow PREACTOR to X3:
The setup consists in indicating:
Block number 1
| Identifier (field ID) |
|
Identification code of the interface setup. |
| field INTIT |
| Operations (field OPEPIT) |
|
Enter the pivot code describing the file lines of the Operations/WOs to export: EXPOF.csv. |
| Products (field ITMPIT) |
|
Enter the pivot code describing the file lines of the Products to export: EXPITEM.csv. |
| Customers (field BPCPIT) |
|
Enter the pivot code describing the file lines of the Customersto export: EXPCLI.csv. |
| Projects (field PJTPIT) |
|
Enter the pivot code describing the file lines of the Projectsto export: EXPAFF.csv. |
| Orders (field ORDPIT) |
|
Enter the pivot code describing the file lines of the Orders to export: EXPCOM.csv. |
| BOMs (field BOMPIT) |
|
Enter the pivot code describing the file lines of the BOMs to export: EXPBOM.csv. |
| Grouping (field GRUBOMFLG) |
|
This indicator is activated to specify that all material requirements of a WO must be grouped by product: the quantities required for all the WO operations will be added to the first operation of the WO requiring this product. |
| Purchasing (field POFPIT) |
|
Enter the pivot code describing the file lines of the Purchasing to export: EXPACH.csv. |
| Stock (field STOPIT) |
|
Enter the pivot code describing the file lines of the Stocks to export: EXPSTOCK.csv. |
| Work center groups (field TWCPIT) |
|
Enter the pivot code describing the file lines of the work centers to export: EXPGRRES.csv |
| Work centers (field MWSPIT) |
|
Enter the pivot code describing the file lines of the work centers to export: EXPRES.csv. |
| Work centers by group (field WSTPIT) |
|
Enter the pivot code describing the file lines of the work centers to export: EXPGRRESMatrix.csv |
| Alternate work centers (field RPLPIT) |
|
Enter the pivot code describing the file lines of the replacement work centers to be exported: EXPALTER.csv. |
| Secondary resources (field RSSPIT) |
|
Enter the pivot code describing the file lines of the Secondary resources to export: EXPRESSEC.csv. |
Directories
| Destination type (field TYPEXP) |
| Directory to be scanned (field VOLFILRCP) |
| Storage directory (field VOLFILSTO) |
| Index destination (field VOLFILISS) |
The interface processing is carried out via the .csv files.
General information on the files
- For the Sage X3 to PREACTOR, the description of each file line is given by a Pivot specifying the fields orders, their size and describing their loading (directly via table fields or via functions).
The files name, their description and the pivots used by default are indicated below.
- For the PREACTOR flows to Sage X3, the import is carried out by reading a fixed file that cannot be set up.
|
Expected files |
|
Default |
|
Work orders/operations |
PREOPE |
|
|
Products |
PREITM |
|
|
Customers |
PREBPC |
|
|
Projects |
PREPJT |
|
|
Orders |
PREORD |
|
|
|
Material tracking files: |
|
|
BOMs |
PREBOM |
|
|
Stocks |
PRESTO |
|
|
Purchasing |
PREACH |
|
|
Resource files: |
|
|
|
Work stations |
PREWST |
|
|
Work centers |
PRECDC |
|
|
Work centers by work center (resources matrix) |
PRECWST |
|
|
Replacement work centers |
PRERWST |
|
|
|
Secondary resource files: |
|
|
Secondary resources |
PRERSS |
|
Expected files |
|
Pivot |
|
Planning results |
No pivot |
The PIVOTSFILE entry point of the CONNECTFCT processing is used to modify the files coding and the column separator.
Pivot: PREOPE
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
WO number |
A |
No |
|
OPERATIONS |
MFGNUM |
Order no. |
No |
|
|
2 |
WO description |
A |
Yes |
|
MFGITM |
MFGDES |
WO description |
No |
|
|
3 |
WO status (1) |
N |
Yes |
|
OPERATIONS |
OPSSTA |
Order status |
No |
|
|
4 |
Priority (2): |
N |
Yes |
|
MFGHEAD |
MFGPIO |
Priority |
No |
|
|
5 |
Product code |
A |
No |
|
MFGITM |
ITMREF |
Product |
No |
|
|
6 |
Quantity |
N |
No |
|
MFGOPE |
EXTQTY |
Planned quantity |
No |
|
|
7 |
Operation status (3) |
N |
No |
|
OPERATIONS |
OPESTA |
Operation status |
No |
|
|
|
|
|
|
|
OPERATIONS |
WFICTRTDAT |
|
Yes |
|
|
8 |
Reconciliation date (file extraction) |
DH |
No |
|
OPERATIONS |
WDHFIC |
|
No |
|
|
9 |
Unit |
A |
Yes |
|
ITMMASTER |
STU |
Stock unit |
No |
|
|
10 |
WO end lead-times |
D |
No |
|
MFGHEAD |
OBJDAT |
Initial objective |
No |
|
|
11 |
Customer code |
A |
Yes |
|
OPERATIONS |
WCLI |
|
No |
|
|
12 |
Project code |
A |
Yes |
|
MFGITM |
PJT |
Project |
No |
|
|
13 |
Order code |
A |
Yes |
|
MFGITM |
VCRNUMORI |
Original journal |
No |
|
|
14 |
Operation number |
N |
No |
|
OPERATIONS |
OPENUM |
Operation |
No |
|
|
15 |
Operation title |
A |
Yes |
|
OPERATIONS |
WDES |
|
No |
|
|
16 |
Work center (Workshop) |
A |
No |
|
OPERATIONS |
WCR |
|
No |
|
|
17 |
Main work center (4) |
A |
No |
|
OPERATIONS |
EXTWST |
Planned work station |
No |
|
|
18 |
Type of Process Time (5) |
N |
No |
|
OPERATIONS |
PROTIMTYP |
No |
|
|
|
19 |
Process time |
N |
No |
|
OPERATIONS |
EXTOPETIM |
Planned op. time |
No |
|
|
20 |
X3 setting time (6) |
N |
Yes |
|
OPERATIONS |
EXTSETTIM |
Planned setting time |
No |
|
|
21 |
Preparation time (7) |
N |
Yes |
|
OPERATIONS |
PRPTIM |
Picking time |
No |
|
|
22 |
Wait times |
N |
Yes |
|
OPERATIONS |
PSPTIM |
Post operating time |
No |
|
|
23 |
Overlapping in % (8) |
N |
No |
|
OPERATIONS |
WLNKTIM |
|
No |
|
|
24 |
Overlapping code (9) |
N |
No |
|
OPERATIONS |
WLNKTYP |
|
No |
|
|
25 |
Grouping time |
A |
Yes |
|
OPERATIONS |
SCHGRP |
Grouping criteria |
No |
|
|
26 |
Operator secondary Constraint |
A |
Yes |
|
MFGOPE |
EXTLAB |
Planned M-O work center |
No |
|
|
27 |
Operators No. |
N |
Yes |
|
MFGOPE |
EXTLABNBR |
Planned mo number |
No |
|
|
28 |
% operator use |
N |
Yes |
|
MFGOPE |
OPELABCOE |
Operation m-o time coefficients |
No |
|
|
29 |
Tool secondary constraint |
A |
Yes |
|
MFGOPE |
EQUNUM |
Tools |
No |
|
|
30 |
Tools no. |
N |
Yes |
|
MFGOPE |
WEQUNBR |
|
No |
|
|
31 |
% tools use |
N |
Yes |
|
MFGOPE |
WEQUPER |
|
No |
(1) 1 = Firm, 2 = Planned, 3 = Suggested
(2) 1 = Normal, 2 = Urgent, 3 = Very urgent.
(3) 1 = Pending, 2 = Previous in progress, 3 = Previous paid, 4 = Pending, 5 = Paid
(4) the alternative work centers are given via the alternative work centers file.
(5) 1 = unitary time, 2 = global time.
(6) Can be disconnected by a "Toogle" field in the resource groups table.
(7) Added to the previous operation wait time.
(8) 100% = no overlapping
(9) 1 = start - start = synchro at start, 2 = successor = no overlapping, 3 = end - end = synchro at the end, 4 = WO synchro
The overlapping code and the overlapping % on an operation indicate the position of the next operation. So the overlapped operation has the code 1 and the overlapping %.
The overlapping code 4 is contained in the concerned operation, it indicates that the operation has to start at the same moment as the WO first operation.
Notes:
Pivot: PREITM
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Product code |
A |
No |
|
MFGITM |
ITMREF |
Product |
No |
|
|
2 |
Description 1 |
A |
Yes |
|
ITMMASTER |
ITMDES1 |
Description 1 |
No |
|
|
3 |
Description 2 |
A |
Yes |
|
ITMMASTER |
ITMDES2 |
Description 2 |
No |
|
|
4 |
Description 3 |
A |
Yes |
|
ITMMASTER |
ITMDES3 |
Description 3 |
No |
|
|
5 |
Product category |
A |
Yes |
|
ITMMASTER |
TCLCOD |
Category |
No |
|
|
6 |
Attribute 1 |
A |
Yes |
|
ITMMASTER |
ATT1 |
|
No |
|
|
7 |
Attribute 2 |
A |
Yes |
|
ITMMASTER |
ATT2 |
|
No |
|
|
8 |
Attribute 3 |
A |
Yes |
|
ITMMASTER |
ATT3 |
|
No |
|
|
9 |
Attribute 4 |
A |
Yes |
|
ITMMASTER |
ATT4 |
|
No |
|
|
10 |
Attribute 5 |
A |
Yes |
|
ITMMASTER |
ATT5 |
|
No |
Pivot: PREBPC
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Customer code |
A |
No |
|
BPCUSTOMER |
BPCNUM |
Customer |
No |
|
|
2 |
Customer name |
A |
Yes |
|
BPCUSTOMER |
BPCNAM |
Corporate name |
No |
|
|
3 |
Postcode |
A |
Yes |
|
BPADDRESS |
POSCOD |
Postcode |
No |
|
|
4 |
Town/city |
A |
Yes |
|
BPADDRESS |
CTY |
Town/city |
No |
|
|
5 |
Contact number |
A |
Yes |
|
BPCUSTOMER |
CNTNAM |
Default contact |
No |
|
|
6 |
Contact's phone no. |
A |
Yes |
|
CONTACT |
TEL |
Telephone |
No |
|
|
7 |
Email address |
A |
Yes |
|
CONTACT |
WEB |
|
No |
Pivot: PREPJT
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Project code |
A |
No |
|
OPPOR |
OPPNUM |
Project chrono |
No |
|
|
2 |
Project description |
A |
Yes |
|
OPPOR |
OPPDES |
Project description |
No |
Pivot: PREORD
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Order code |
A |
No |
|
SORDER |
SOHNUM |
Order no. |
No |
|
|
2 |
Order description |
A |
Yes |
|
SORDER |
WDES |
|
No |
Pivot: PREBOM
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
WO number |
A |
No |
|
ORDERS |
VCRNUM |
Journal |
No |
|
|
2 |
Product reference |
A |
No |
|
ORDERS |
ITMREF |
Product |
No |
|
|
3 |
Quantity |
N |
No |
|
ORDERS |
RMNEXTQTY |
Remaining quantity |
No |
|
|
4 |
Operation (not used) |
N |
No |
|
ORDERS |
VCRSEQ |
Document sequence no. |
No |
Notes:
Pivot: PRESTO
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Product code |
A |
No |
|
ITMMVT |
ITMREF |
Product |
No |
|
|
2 |
Stock date |
D |
Yes |
|
ITMMVT |
WDATSTO |
|
No |
|
|
3 |
Quantity in stock |
N |
Yes |
|
ITMMVT |
PHYSTO |
'A' internal stock |
No |
Pivot: PREACH
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Purchase order no. |
A |
No |
|
ORDERS |
VCRNUM |
Journal |
No |
|
|
2 |
Product reference |
A |
No |
|
ORDERS |
ITMREF |
Product |
No |
|
|
3 |
Ordered quantity |
N |
No |
|
ORDERS |
RMNEXTQTY |
Remaining quantity |
No |
|
|
4 |
Planned due date. |
D |
No |
|
ORDERS |
ENDDAT |
End date |
No |
Pivot: PREWST
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Code |
A |
No |
|
WORKSTATIO |
WST |
Work centre |
No |
|
|
2 |
Description |
A |
Yes |
|
WORKSTATIO |
WSTDES |
chge work center title |
No |
|
|
3 |
Type (1) |
A |
Yes |
|
WORKSTATIO |
WSTTYP |
Work center type |
No |
|
|
4 |
Efficiency (2) |
N |
Yes |
|
WORKSTATIO |
EFF |
Efficiency in % |
No |
|
|
5 |
Finished or Infinite? (3) |
N |
Yes |
|
WORKSTATIO |
WCONSTRAINT |
Valuation dimension |
No |
|
|
6 |
Dimension |
A |
Yes |
|
WORKSTATIO |
VLTCCE |
|
No |
(1) 1 = Machine, 2 = MO, 3 = SC Sub-contracting.
(2) If not entered, the value is set by default on 100%.
(3) If this value is not entered in the file, it should be done manually in the PREACTOR table; it must follow the rule: 0 = Infinite, 1 = Finished.
N.B.: by default, PREACTOR does not take into account the value passed by Sage X3.
Pivot: PRECDC
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Code |
A |
No |
|
TABWRKCTR |
WCR |
Work centre group |
No |
|
|
2 |
Description |
A |
Yes |
|
TABWRKCTR |
WCRDES |
Center title |
No |
Notes:
Pivot: PRECWST
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Work center code |
A |
No |
|
WORKSTATIO |
WCR |
Work centre |
No |
|
|
2 |
Work station code |
A |
No |
|
WORKSTATIO |
WST |
Work centre |
No |
Notes:
Pivot: PRERWST
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Main work station code |
A |
No |
|
RPLWST |
WST |
Work centre |
No |
|
|
|
|
|
|
|
RPLWST |
I |
|
Yes |
|
|
2 |
Alternative work station code |
A |
Yes |
|
RPLWST |
RPLWST |
Replacement work center |
No |
Pivot: PRERSS
|
File |
No. |
Title |
Type |
Optional |
Pivot |
Table code |
Field code |
Title |
Field |
|
|
1 |
Code |
A |
No |
|
WORKSTATIO |
WST |
Work centre |
No |
|
|
2 |
Description |
A |
Yes |
|
WORKSTATIO |
WSTDES |
chge work center title |
No |
|
|
3 |
Type (1) |
A |
No |
|
WORKSTATIO |
WSTTYP |
Work center type |
No |
(1) Resource type: 2 = Operator, 3 = Tools
|
No. |
Title |
Type |
Optional |
|
1 |
WO number |
A |
No |
|
2 |
Operation number |
N |
No |
|
3 |
Work station |
A |
No |
|
4 |
Picking start date |
DH |
No |
|
5 |
Setup start date |
DH |
No |
|
6 |
Process end date |
DH |
No |
|
7 |
Wait end date |
DH |
No |
Note: this file is a fixed .csv file, that cannot be setup via a pivot.
The only error messages are the generic ones.