Launch PREACTOR interface
This function is used to manage the flows coming from and designed to the advanced planning and scheduling product (APS): PREACTOR.
This processing uses the setups specified in the PREACTOR setup function.
The principles of the interface functioning are given in the documentation about the PREACTOR setup.
Prerequisite
Refer to documentation Implementation
Screen management
Entry screen
Terms for the interface implementation
The interface is carried out in three independent main steps:
- Picking the data to export: selection of the data and constitution of the the work files.
- Use of the files and planning in PREACTOR.
- Import with update of the database with the planning results defined in PREACTOR.
Two distinct steps have to be started in X3:
- Preparation of the data (in update mode): export.
- Update of the results: import.
The processing can be carried out in Simulationor in Update mode.
- When exporting, it is possible to:
- select the production site concerned,
- enter a date range that defines the period concerned,
- enter a selection formula,
- select the orders to analyze according to their status: planned, firm or suggested,
- specify if the product code is of Routing or Product type,
- specify if the project type is Journal or Project
- indicate if the log file has to include the orders retained in the selection. - When importing, it is possible to select the production site and to specify if the log file appearing after the processing has to include the list of optimized orders.
Block number 1
Identifier (field ID) |
Identification code of the interface setup. |
field INTIT |
Processing
Action (field OPTION) |
Select the type of action implemented by the processing:
|
Processing mode (field TRTMOD) |
Select the processing mode of the action:
|
Selection criteria
Production site (field MFGFCY) |
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
Start date from (field STRDAT) |
Enter the start and end date ranges to select the period concerned. |
End date until (field ENDDAT) |
Formula (field FORMULE) |
Enter, select or build an Enterprise Management filter calculation expression using the formula editor.
|
Statuses
Planned work orders (field WOPFLG) |
It is possible to select the orders to analyze according to their status. |
Firm work orders (field WOFFLG) |
It is possible to select the orders to analyze according to their status. |
Work order suggestions (field WOSFLG) |
It is possible to select the orders to analyze according to their status. |
Suggestion filter (field MRPFLG) |
This flag is used to filter the suggestions based on their origin. |
Extraction
Product code (field RELITM) |
Select a type of product code for the extraction in the case of data preparation:
|
Project (field PJTCOD) |
Select a type of project for the extraction in the case of data preparation:
|
Log
Selected work orders (field TRACE1) |
Depending on the type of requested processing, it is possible to activate one of the log file types:
|
Optimized work orders (field TRACE2) |
Directories
Destination type (field TYPEXP) |
Select the type of sender: customer or server. |
Index destination (field VOLFILISS) |
Directory to be scanned (field VOLFILRCP) |
Storage directory (field VOLFILSTO) |