This function is used to manage the flows coming from and designed to the advanced planning and scheduling product (APS): ORTEMS.

This processing uses the setups specified in the ORTEMS setup function.

SEEREFERTTO The principles of the interface functioning are given in the documentation about the ORTEMS setup

Prerequisite

SEEREFERTTO Refer to documentation Implementation

Screen management

Entry screen

Terms for the interface implementation (in interactive mode)

It is required to install ORTEMS on the client to launch the interface.
The interface proceeds in two main steps. They have to be carried out independently:

1/ Picking the data to export:

    • Selection of the data and constitution of the the work files.
    • Use of the files and opening of the planning in ORTEMS (*). 

2/ Update the database:

    • Extraction of the ORTEMS planning data (*).
    • Direct integration of the results in Sage X3.

(*) This stage is carried out if the ORTEMS Integration box is checked.

The interface processing can be carried out in Simulationor in Update mode.

  • To integrate a planning of WOs, it is necessary to launch the two distinct steps in Sage X3:
     
    --> Preparation of the data, in Update mode.
    --> Update of the results.
  • In order to carry out a valuation/simulation of planning on WOs, it is only necessary to launch the step: Preparation of data in Simulationmode.

For the Preparation of data, it is possible to:

- select the production site concerned,
- enter a date range that defines the period concerned,
- enter a selection formula,
- select the orders to analyze according to their status: planned, firm or suggested,
- possibly change the release margin,
- specify if the product code if of Range or Producttype,
- specify if the type of the project is Journal or Project
- indicate if the log file has to include the orders retained in the selection,
- possibly modify the root directory and the ORTEMS environment reference.

For the Update of the results, it is possible to:
 
- select the production site
- specify if the log file created at the end of the processing has to include the list of optimized orders,
- modify the information (root directory and environment code) required when launching ORTEMS automatically.
 

Entry point

  • The SUBOROINT entry points are used to add specific processings before or after having been triggered.
  • The PITMFG entry points have an impact on the selected elements.

Batch task

This function can be run in batch mode. The standard task OROINT is provided for that purpose.

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation