Component Requirement Calculation - Implementation
Prerequisite
Activity codes
The following activity codes (sorted by type) may have an impact on the way the function operates :
ECC : Product version management
General parameters
The following general parameters may change the way the function is working :
Manufacturing
SCAMAJ (defined at level Site) : Material loss increase / costs
Tables used
The following tables are implemented by the function :
Table |
Table description |
---|---|
BOMD [BOD] |
Detail BOMs |