Material Loss Increase / Costs
This parameter is used in the Provisional cost calculation function (standard, revised, budget and simulated).
- If this setup is set to YES, the cost calculation takes into account the reject percentage carried by the BOM link in the component quantity calculation.
- If not, only the net quantity is considered.
Level of localization/Global variable
This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group COS (Costs), The following parameters are also associated with this chapter and group :
- ARRQTYCPN (Apply link qty rounding)
- CLCBUDRAT (Dimension rate selection bud C)
- CLCCUTRAT (Dimension rate selection act C)
- CLCSIMRAT (Dimension rate selection sim C)
- CLCSTDRAT (Dimension rate selection std C)
- CLCWOCAUT (Auto provisional costs)
- CSTRCPORD (Provisional cost declaration)
- EFFCSTUSE (Efficiency/cost considered)
- MFCRATCPL (Actual PC dim rate selection)
- MFCRATEXT (Expected PC dim rate selection)
- OPRRATE (Labor rate selection)
- OVECOLBUD (Budget calc overhead column)
- OVECOLCUT (Updated calc overhead column)
- OVECOLMFC (PC calc overhead column)
- OVECOLSIM (Simulated calc overhead column)
- OVECOLSTD (Standard calc overhead column)
The global variable GSCAMAJ is associated with it.
Functions concerned
The following functions are associated with this parameter :
Stock > Inquiries > Stock > Trial kitting
Costing > Cost calculations > Budgeted cost calculation
Costing > Cost calculations > Revised cost calculation
Costing > Cost calculations > Simulated cost calculation
Costing > Cost calculations > Standard cost calculation