Upgrade - Implementation
Prerequisites
- The site must have been defined as a production site.
- Pending work orders must be at status 'Planned' or 'Pending firm' to be selected.
- Only routing data is reread for work orders with allocated materials; bills of materials (BOMs) data is not reread.
Miscellaneous prerequisites
General parameters
The following general parameters may change the way the function is working :
Manufacturing
CLCWOCAUT (defined at level Folder) : Auto provisional costs
CMPUSBCTR (defined at level Folder) : Usable component control
CUMMAT (defined at level Company) : Material accumulation mode
ROUSTE (defined at level Folder) : Operation sequence increment
Authorizations
An authorization can be granted for this function to limit the processes to a company or a site.
Tables used
The following tables are implemented by the function :
Table |
Table description |
---|---|
MFGITM [MFI] |
Work orders - products |
MFGMAT [MFM] |
Work order - materials |
MFGOPE [MFO] |
Work order - operations |
OPERATIONS [OPS] |
Load in progress |
ORDERS [ORD] |
WIP |
SCHEDULING [SCH] |
Work order scheduling |