Prerequisites

  • The site must have been defined as a production site.
  • Pending work orders must be at status 'Planned' or 'Pending firm' to be selected.
  • Only routing data is reread for work orders with allocated materials; bills of materials (BOMs) data is not reread.

Miscellaneous prerequisites

General parameters

The following general parameters may change the way the function is working :

Manufacturing

  CLCWOCAUT (defined at level Folder) : Auto provisional costs

  CMPUSBCTR (defined at level Folder) : Usable component control

  CUMMAT (defined at level Company) : Material accumulation mode

  ROUSTE (defined at level Folder) : Operation sequence increment

Authorizations

An authorization can be granted for this function to limit the processes to a company or a site.

Tables used

The following tables are implemented by the function :

Table

Table description

MFGITM [MFI]

Work orders - products

MFGMAT [MFM]

Work order - materials

MFGOPE [MFO]

Work order - operations

OPERATIONS [OPS]

Load in progress

ORDERS [ORD]

WIP

SCHEDULING [SCH]

Work order scheduling