Production Plan - Implementation
Prerequisite
Activity codes
The following activity codes (sorted by type) may have an impact on the way the function operates :
Dependent activity codes
These codes are never entered in folder management, because their value is calculated :
PSE (Seasonality plan).
Functional
CCN : Concessions
LEA : Lease contract
Sizing
ANA : No. of analytical dimensions
NPPL : Max no. PPL rec for a plan
Localization
KPO : Portuguese Localization
KRU : Russian localization
General parameters
The following general parameters may change the way the function is working :
Fixed assets
ACCPERCTL (defined at level Company) : Accounting period control
PPLAUTNUM (defined at level Company) : Production plan numbering
REMAFCY (defined at level User) : Persistence of the site
Sequence numbers
The sequence numbers used to number the documents managed by this function are :
PDP : Production workbench
The sequence number assignment function defines the sequence number which is used
Authorizations
This function is object managed. The creation, modification, and deletion operations can be activated or deactivated for a given user. Filters by roles can also be associated with this function.
As data is linked to a site, a filter per site can be activated.
Miscellaneous prerequisites
A production plan can be defined for a company only if one context of this company has been declared as the context of OPE management.