Pending modifications
This function is used to optimize the calculation of the assets. It enables the user to launch the update process of the asset calculation status based on the following principle:
The launch of the first calculation enables the user to get the periodic depreciation grid of an asset for the number of fiscal years at the Contexts setup level, in the limit of the asset depreciation duration. During this calculation, the status of the asset is set to Calculated for each period calculated.
During the period closure and when there is no modification of the setup or job action done on the asset during the period, the status of the asset is not modified; it keeps its value: Calculated.
If the asset is concerned by the installation of a job action (depreciation, new evaluation, etc.) or the modification of an setup item (the item list is given below), the re-calculation of the asset is necessary.
As a consequence:
- When a specific action is done on an asset, the calculation status of the asset is automatically set to Not calculated for the plans of the context affected by the action.
- When the modification of a setup item is done, two cases can occur:
- either the number of concerned assets is inferior to the value set by the DIRUPDTSD- Direct update threshold, and as a consequence, the calculation status of these assets on each concerned context is directly updated to be set to Not calculated,
- or the number of concerned assets is superior to the value set by this parameter, and as a consequence, the setup modifications are saved and suspended.
it is the process installed by this function which will enable the user to set the calculation statuses of these assets to Not calculated.
Notes :
- Before launching the process, it is possible to view the list of the setup modifications waiting for the process at the level of the Contexts definition function, by the Modifications pending right-click option on the line of the context. This list is also available at the level of the detailed window of the Company status.
- When modifications are pending and no process is launched via this function, it is the calculation process which automatically links both processes: the update process of the assets concerned (to set it to Not calculated), then the calculation process for these assets. The list of the modifications processed before the calculation is then indicated at the level of the calculation process report.
The installation of this function is interesting as it enables the user to dissociate the update process of the asset calculation status from the calculation itself.
- Any closure process is prohibited as long as there modifications waiting to be processed.
For more information concerning the execution of the calculation optimization, please refer to the attached document: Calculation optimization.
Prerequisite
Refer to documentation Implementation
Screen management
Entry screen
This function is made up of a single screen that is used to:
- The selection of the company or context which the process deals with.
All companies and contexts are selected by default. - To launch the process by activating the .
Upon process completion, a log file displays the list of modifications on hold that have been processed for each contexts concerned, and the number of modifications done for each of them.
Selection
All companies (field ALLCPY) |
Select the All companies check box to include all companies or leave this check box unselected and enter a specific company in the Company field. |
Company (field CPY) |
This field displays the company code. |
All contexts (field ALLCNX) |
When it is activated, this tick box enables the user to specify that the process must be applied to all the contexts (either for all the companies or for the selected company). |
Context (field CNX) |
Enter the depreciation context. |
Pending modification list
It can be the modification:
- Of one or several of the following parameters from the AAS chapter (Fixed assets):
- IMLRVEISS – Automatic depreciation increase at the issue
The modification of this parameter implies all issued assets (as well an issue on the current period, a following one as a retro-active issue) displaying a depreciation balance at the issue date.
It needs a new calculation to calculate or re-initialize this increase amount.
- PCOTVAPMV – Introduction of VAT on capital gains or losses
The modification of the setup implies all issued assets, on all the contexts of the company which the setup has been modified for (or all companie if the setup has been modified at Folder level).
- Of one or several of the values from the following miscellaneous tables:
- 512 - Team code
The modification of the coefficient of a team code applies to all assets having a plan for this team code.
- 531 - Vehicle financial threshold
The modification in a vehicle's code threshold concerns all assets having a plan for this vehicle code. Of a standard depreciation method option or of a free depreciation method setup
The modification of an option applies to all assets which plan has this depreciation method modified.
- Of contexts. It can either be:
- Of the modification of setup Prorata temporis in weeks: the modification of this setup concerns all the assets of the company on all the plans of the modified context.
- Of a context recalculation request on behalf of a user (with a right click on one of the context plans).