PC Calc Overhead Column
This parameter is used in the Sub-contracting provisional cost calculation and Sub-contracting cost price calculation functions.
For each product, it is possible at the level of the Cost tab of the Product-site record, to attach an overhead code to the product.
An overhead code is defined by the calculation method (cumulated or cascade), an application method (on stock receipt, on stock issue) and a list of overhead natures: associated with each overhead nature is a fixed rate to be applied or a calculation formula on the basis of which the overhead value to be posted to this nature for the code concerned will be calculated.
It is possible for a single nature to have up to 4 formulas or fixed rates in 4 columns (column A, column B, column C, Column D).
During the overhead calculation carried out at the time of the provisional cost calculation and of the cost price calculation, it is necessary to enter which formula or fixed rate, that is to say column A, B, C, D, should be used to carry out the calculation.
This general parameter is used to choose one of these columns by default.
Level of localization / Global variable
This parameter is defined at the level Site. It belongs to Chapter ACH (Purchase) and the Group COS (Costs), The following parameters are also associated with this chapter and group :
- BETFCYCST (Integration of inv. elements)
- CLCEOCAUT (Auto provisional costs)
- CSTEORORD (EO provisional receipt cost)
- VLTSCEOEXT (Service val price/planned PC)
The global variable GOVECOLSCO is associated with it.
Functions concerned
The following functions are associated with this parameter :
Costing > Subcontract costs > Calc. expected subcon. cost
Costing > Subcontract costs > Calculate actual subcon. cost