Scheduling horizon
This parameter is used in the automatic scheduling function.
This function proposes the scheduling or rescheduling of the work orders.
The scheduling is time range constrained: the user must specify up to which end date they wish to schedule the WOs. This "up to end date" is initialized thanks to the SCHEDHOR parameter as follows:
Up to end date = today's date + SCHEDHOR
Level of localization / Global variable
This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group LOA (Scheduling/Load), The following parameters are also associated with this chapter and group :
- DEFDIH ( Default schedule)
- GPERCOMP (% LT reduction default)
- GTPSCOMP (Slack time compression)
- OPTSCDRAZ (Reschedule optimized orders)
- POHSCDRAZ (Reschedule optimized orders)
- SCHEDWPO (Schedule wait and post-op time)
The global variable GSCHEDHOR is associated with it.