Schedule wait and post-op time

This parameter—SCHEDWPO—is used when scheduling work orders. You use it to define how the scheduling calculations include waiting time and post-operation time in the load times.


Yes: This is the default value for this parameter. When both waiting time and post-operation time are recorded, the scheduling calculations include both times independently. The times are displayed separately in the results of the scheduling, in the scheduling graph, and in the list.

No: The scheduling calculations use the longest of either the waiting time or the post-operation time.

Level of localization/Global variable

This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group LOA (Scheduling/Load). The following parameters are also associated with this chapter and group:

The global variable GSCHEDWPO is associated with it.

Functions impacted

The following functions are associated with this parameter:

Comments

Preparation time is displayed in full in the scheduling graph and list.