Use this parameter to enter the security lead time to be applied for purging traceability records. This processing applies to all the traceability records with an allocation date earlier than the reference date, which is calculated as follows: todays's date - security lead time.

Enter the lead time in months.

When running the processing, you can only update the calculated date with an earlier date.

Level of localization / Global variable

This parameter is defined at the level Folder. It belongs to Chapter STO (Inventory) and the Group PUR (Purges), The following parameters are also associated with this chapter and group :

No global variable is associated with it.

Associated functions

The following functions are associated with this parameter :

  Stock > Periodic processing > Purge > Traceability

Activity codes

The following activity codes (sorted by type) are associated with the parameter :

  TRA :  Stock traceability management

Comments

If this parameter is not entered or if its value is null, a security lead time of 60 months automatically applies.