Production dispatch report
Use this report to view a work order by work center detail of the expected production and remaining amounts. You can also view work orders with operations that have not been started.
To enter a start date range for the Operation start date parameter, set the First value for Include operations to Started.
All settings for the Include operations > First value include:
All
No date range and all work order operations are displayed that meet the report’s other criteriaNot Started
Dates are filtered based on the Scheduling table for operations with no start dateStarted
A date range can be entered for Operation date by filtering work order operations from the Scheduling table.
Start and eding times use 24-hour time notation. For example, 2:00 p.m. is shown as 14:00.
Prerequisites
List of criteria
|
Parameter |
Parameter title |
Type |
|---|---|---|
|
mfgfcydeb |
Site range |
|
|
wcgdeb |
Work center group range |
|
|
wcdeb |
Work center range |
|
|
schsel |
Include operations (Local menu Not started, Started, All) |
|
|
datedeb |
Operation start date |
D |
|
impselections |
Print selections (Local menu No, Yes) |
Description of the report
The report details include the start and end date, start and end time, work order, operation, machine, setup, priority, part number, and expected and remaining quantity.
The report filters include site, work center group, work center, date range, and operations.