Use this report to obtain the full details of the working patterns, or shift patterns defined in the Weekly structures function (GESTWD).

All or a range of shift patterns can be included in the report.

Prerequisite

Access to the report

This report can be accessed from the report menu of the group Manufacturing - Technical data.

It is also called by default from the following functions :

  Setup > Manufacturing > Weekly structures

  Setup > Customer relation > CRM activity > Weekly structures

List of criteria

Parameter

Parameter title

Type

twddeb

Structure range

TWD

impselections

Print selections (Local menu No, Yes)

M1

Comments

In a start/end range type of parameter, not entering anything for the two values means that the report will ne be restricited to the parameter value.

Description of the report

This report prints the details of the individual working patterns, or shift patterns that have been defined. The length of the standard working day is provided as well as the length of each working day.

The following fields are included:

  • Schema
    The weekly structure code or shift pattern code.
  • Description
    The description of the Schema code.
  • Nominal capacity
    The length, in hours, of the standard working day.
  • [Week day]
    The length, in hours, of the working day.