This function is used to compare two projected costs or two cost prices for a given product, whether they were calculated on the same site or two different sites.
This function is used to calculate the variances in percentage or in quantity, with a comparison by unit or in the total amount. It displays the variances by cost categories (Material, Machine, Overheads) on various tabs.
Refer to documentation Implementation
Presentation
Product
The product on which the costs will be compared must be indicated.
Variance type
The variance type which will be displayed in the last column of the screens must be indicated.
Percentage: The comparison column indicates a percentage. The first cost entered is used as reference cost.
Unit Display
It is possible to either compare the costs by unit (box checked), or compare costs according to the data of each cost calculation (calculation quantity).
This paragraph is used to indicates the cost comparison basis. The first cost type entered is used as reference cost in the comparison.
For each cost to compare, it is necessary to indicate:
Site
Site from which the cost is taken.
Cost type
The cost type to compare must be indicated.
Calculation date
The calculation date can be entered for all types of costs.
Work order no.
This number can be entered in the case of a search for a cost with the type PCP or projected cost.
The contextual menu is used to search the required order number.
The comparison can be single-level or multi-level. In single-level comparison, the various cost types of the semi-finished are totally integrated in the material part. In multi-level comparison, they are split between the material part, the machine part, ...
Close
Fields
The following fields are present on this tab :
Block number 1
|
This field indicates the references of the product to process. |
|
The calculated variance can be displayed in quantity or in percentage. |
|
When this box is checked, all displayed sub-totals represent unit values. |
Currency
  |
Level
|
Selection of the display methods for the costs. The choice is only possible to compare the standard costs. When "Single level" is ticked, the global costs for the components are included in the material. When "Multi-level" is ticked, the costs are distributed according to their real nature. |
Cost 1
|
This field contains the storage and/or production site. It is initialized by default with the normal storage site of the user. |
|
Cost type to choose from 'Standard', 'Revised', 'Budget', 'Simulated'. |
|
  |
|
Cost calculation date. This date is stored in Product-cost. It is initialized to the current date and it is not necessarily included in the calculation year (for instance, calculation of the 2000 buget performed in December 1999). |
|
  |
|
  |
|
  |
|
Work order/sub-contract order numbers used to select a cost price. |
Cost 2
|
This field contains the storage and/or production site. It is initialized by default with the normal storage site of the user. |
|
Cost type to choose from 'Standard', 'Revised', 'Budget', 'Simulated'. |
|
  |
|
Cost calculation date. This date is stored in Product-cost. It is initialized to the current date and it is not necessarily included in the calculation year (for instance, calculation of the 2000 buget performed in December 1999). |
|
  |
|
  |
|
  |
|
Work order/sub-contract order numbers used to select a cost price. |
Graph
|
  |
Close
Presentation
This tab is used to display the total of the costs by category (Material, Labor Cost, Subcontracted, Overheads, Main total, Calculation Quantity).
Close
Fields
The following fields are present on this tab :
Block number 1
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Cost 1
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
  |
|
  |
Cost 2
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Variance
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Close
Presentation
This tab is used to display the cost comparisons by sub-category of the categories material and subcontracted.
Close
Fields
The following fields are present on this tab :
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Block number 2
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Close
Presentation
This tab is used to display the cost comparisons by sub-category of the categories machine and labor.
Close
Fields
The following fields are present on this tab :
Grid Machine
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Grid Labor
|
  |
|
  |
|
  |
|
  |
Close
Presentation
This tab is used to display the comparisons by cost group from overheads.
Close
Fields
The following fields are present on this tab :
Block number 1
|
  |
|
  |
|
  |
|
  |
|
  |
Cost 1
|
  |
|
  |
|
  |
|
  |
|
  |
Cost 2
|
  |
|
  |
|
  |
|
  |
|
  |
Variance
|
  |
|
  |
|
  |
|
  |
Close
By default, the following reports are associated with this function :
ITCMATCH : Cost comparison
This can be changed using a different setup.
In addition to the generic error messages, the following messages can appear during the entry :
Product ... The record does not existThis message appears after the entry of the product reference if the corresponding record has not been found. You can check this by using the selection window.
Site... The record does not exist
This message appears after the site entry if the corresponding record is not found. You can check this by using the selection window.
Both sites must have the same currency!
This message is displayed after entering the second site if its currency is not the same as the currency of the first site.
Record does not exist
This message is displayed after entering the calculation date (for projected costs) or after entering the order number (for PCP) when no record corresponds to the criteria entered. You can check this by using the selection window.