This function is used to launch the automatic deallocation processing of the materials linked to the sub-contracting for a given site, a given period and selected sub-contract orders.
This processing can deallocate the material based on the type of initial allocation (global or detailed).
Refer to documentation Implementation
This function is used to launch the automatic deallocation processing of the materials linked to the sub-contracting for a given site, a given period and selected sub-contract orders.
This processing can deallocate the material based on the type of initial allocation (global or detailed).
Presentation
This function is made of a single screen authorizing the entry of selection criteria for materials to deallocate and priority orders to apply to sub-contracting orders to process.
Close
Fields
The following fields are present on this tab :
Selection criteria
|
The order site is a mandatory field. By default, it is fed with the order site associated to the user. It can be modified by another site authorized for the operator, depending on their authorizations. |
|
  |
|
This field makes it possible to select the materials whose requirement date is prior to the date mentioned. The date is initialized by default with the current date and the lead time indicated by the value of setup ALLHOR - Allocation horizon (chapter GPA, group MIS). |
Block number 2
|
  |
|
This code is used to select a deallocation by type (globale/détail) or a complete deallocation. |
|
This field derminates the assignment type of the material:
|
|
This field is used to specify the order according to which the various subcontract orders must be selected:
|
Start - end range
|
Start and end ranges used to select the subcontract orders to process according to their priority code. |
|
  |
|
Start and end ranges used to select the sub-contracting orders to process according to their references. |
|
  |
|
Start and end ranges used to select the subcontract orders to process according to the references of the projects for which they are released. |
|
  |
|
Start and end ranges used to select the subcontract orders to process according to their supplier references. |
|
  |
|
Start and end ranges used to select the sub-contracting orders to process according to the reference of the released product. |
|
  |
|
Start and end ranges used to select the subcontract orders to process according to the reference of the material making up the released product. |
|
  |
|
Enter, select or build an Adonix format expression using the formula editor. |
Block number 4
|
  |
|
Box checked: is used to de-allocate the materials in process during automatic allocation. |