This function is used to complete the WIP generated by tracking operations without WO.
As a reminder, here is how the amounts of the tracking operations without WO are assigned to fictitious WOs (only used for regrouping fro the system):
The "Tracking without WO balance" function is used, for a defined period of time specified in the header, to close the WIP and thus to enter to accounting the amount difference between consumptions and productions.
Upon validation of the WIP balance by means of the OK button, the system draws the distinction between the consumptions (materials, operations, overheads...) and the production reportings, and then it generates a type-18 record in the WIPCOST table in order to be able to post this WIP balance.
Refer to documentation Implementation
In the header, the user must select the site and the date range to which tracking operations have been assigned.
Presentation
Once the selections have been carried out, the user must first press the Search button in order to load the two grids. They can then validate by means of the OK button in order to carry out the WIP balance.
Close
Fields
The following fields are present on this tab :
Block number 1
|
  |
|
  |
|
  |
Grid Expenses
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Grid Manufacturing
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
|
  |
Block number 4
|
  |
Close
Action icon
This button provides access to the tracking.
This button provides access to the production cost price of the Work Order.
Close
This function can be run in batch mode, but no dedicated standard task is delivered to run it.