This function is used to determine the production cost (PC) for a work order and to underline the variance between the actual cost and the standard cost (cost based on the data in the BOM) or the cost based on the work order data.If the processing is not performed in a simulation but in a actual situation, the work order must be closed.
The PC calculation can be carried out on a single work order or according to the conditions expressed in a filter in the SCOHEAD, SCOITM and MFGWIP tables.
The PC calculation is based on the WIPCOST table which is fed by input of the subcontract product receptions (material consumption). The standard cost variance records, the adjustment and the WIP balance can be created.
A print-out can be requested at the end of the calculation.
A certain number of inquiries are available to view the cost price history for a product, to compare the PC with respect to the other cost types for the site or for another site.
Refer to documentation Implementation
Presentation
A site and then a work order must be specified.
In the Order no. field, 2 options can be accessed by right click:
The basis for the calculation of the planned subcontract cost, must be specified:
The flexible budget flag is used to correct the calculation database planned with respect to the Planned/Actual ratio.
Close
Fields
The following fields are present on this tab :
Selection
|
|
If this check box is selected, the subcontract orders whose PCs have never been calculated will be processed. |
|
If this check box is selected, the subcontract orders whose PCs have already been calculated will also be processed. It is thus possible to re-calculate a PC after the first calculation. |
|
Production site This is initialized by default with the normal production site for the user. |
|
Subcontract order or filter number. It is possible:
|
Printing
|
The printing of the cost price can be: |
|
The flexible budget flag is used to correct the calculation database planned with respect to the Planned/Actual ratio. |
|
This field is used to specify the calculation basis for the planned production cost:
|
|
  |
|
  |
Close