Setup >  Stock >  Requirements parameters >  Requirements parameters - Implementation  

Display all Hide all

Prerequisites

Other prerequisites

BOM codes assigned to production and subcontract BOMs (bills of materials) must specify that the code can be used for Material Requirements Planning (MRP) and/or in the calculation of the Master Production Schedule (MPS).

 BOM codes

Authorizations

This function is object managed. The creation, modification, and deletion operations can be activated or deactivated for a given user. Filters by roles can also be associated with this function.

As data is linked to a site, a filter per site can be activated.

Tables used

The following tables are implemented by the function :

Table

Table description

FACILITY [FCY]

Sites

PARMRP [PCB]

Requirements parameters

TABBOMALT [TBO]

BOM codes

TABROUALT [TRO]

BOM routings

TABWEEDIA [TWD]

Weekly structures