Use this report to produce a listing of work orders that are overdue, measured from the expected end (due) date recorded on the work order.
All or a range of work orders can be included selected by site code and product code (bill of materials or component code).
Production analysis (Manufacturing > Analysis > Production analysis (FUNANL))
Product axis report (Manufacturing > Analysis > Product axis report (FUNMANL))
This report can be accessed from the report menu of the group Manufacturing - Analysis.
Parameter |
Parameter title |
Type |
---|---|---|
mfgfcydeb |
Plant range |
|
itmrefdeb |
Product reference range |
|
mfgnumdeb |
Work order range |
|
enddat |
Analysis end date |
D |
impselections |
Print selections (Local menu No, Yes) |
This report prints summary details for the individual overdue work orders. The details include the original quantity planned, the quantity complete and the current quantity that is overdue at a given reference date.
Each page of the report has three distinct sections. The following fields are included: