Reports >  Module Manufacturing >  Report TIMPROD (Time analysis report)  

Display all Hide all

This report describes the results of the production analyses for the product dimension view, and more particularly the production times.

(see the Production analyses and Product analysis printing documentations)

This report describes the various productive times of the selected work orders, by site and by production group.

  • Standard times

It is the sum of the productive times of the operations defined in the routing corresponding to the analyzed work order.

  • Planned times

It is the sum of the productive times of the operations defined in the analyzed work order.

  • Achieved times

It is the sum of the times tracked at the level of each operation of the work order.

This report submits three time ratios by work order.

An aggregation is achieved by product and production group.

Prerequisite

List of criteria

Parameter

Parameter title

Type

mfgfcydeb

Plant range

FCY

itmrefdeb

Product reference range

ITM

mfgnumdeb

Work order range

MFG

enddat

Analysis end date

D

impselections

Print selections (Local menu No, Yes)

M1