Submit for scheduling

Use this function to select one or a range of work orders at a specific status for scheduling. Scheduling is the process of sequencing the timing of work order operations according to the length of the operation, their productive and non-productive setting and operation times, and relationships in the work order (or routing for suggestions).

This function uses the generic Finite scheduler interface to connect to Sage X3 Web Scheduling or to any web scheduling solution developed by an ISV (independent software vendor). The web scheduling solution schedules the operations in the defined routing, and if specified, routing version, distributing the workload. It is particularly useful for adjusting unexpected production or supply events.

 The sequence of operations will follow the defined numbering sequence.

You can specify a start date against a work order operation so that a work order is not scheduled to start before the materials are available, for example. If an operation's start date has been set scheduling does not change the date. Scheduling will, however, reschedule other operations around this date.

Whilst a work order is being scheduled (has been submitted for scheduling) it remains at scheduling status Scheduled and work order status Being optimized. At these statuses you cannot modify the work order.

 You can submit a single work order to the web scheduling solution directly from the Work order function (GESMFG) using the Submit for scheduling action.

A routing version, if defined, must be at Available to use status on the production start date (Start date field in the Header section of the work order). If scheduling changes the production start date this might cause an inconsistency with the selected version. Should this situation occur the work order Scheduling status will remain at Not scheduled status. You must either change the routing version or reschedule the work order before you can continue.

Once the scheduling information is correctly set you can use the Planning workbench (FUNDBENCH) to reschedule, deschedule or mark specific operations to be scheduled.

 You must remove a work order from scheduling (deschedule) if you need to modify an operation. You can use either the Remove from scheduling function (GFSOPTFREE) or the Remove from scheduling action directly from the Work order function (GESMFG) to do this.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

The Submit for scheduling function contains a single screen into which you enter your work order selection criteria.

Entry screen

Selection criteria

Use this section to define the production site at which work orders are to be submitted for scheduling and the date range. By default, the search is for all production at the defined site for the next three months but can be changed to search within a range of dates.

Start - end range

Use this section to define the selection ranges to be used for filtering the results of the search.

Statuses

Use this section to filter the results by the status of the work order. The origin of a suggestion can be defined if you include work order suggestions.

You can optionally select the work orders by applying a calculation formula.